About this project study
MnDOT is in the process of identifying potential updates and possible solutions for those who travel along Hwy 12 to be added to a future 2030 resurfacing project between Bridge Ave. and Co. Rd. 139 in Delano.
As part of this corridor study, we are looking at ways to manage access along the corridor to reduce crashes, improve safety and make traffic flow better along the Hwy 12 in Delano.