Improve access
MnDOT will improve access and safety at the north junction of Hwy 27 and Hwy 169 with a new roundabout. The project is currently in the design phase and is scheduled for construction in 2026.
Thank you
MnDOT appreciates those who stopped in and visited with us at the open house held Tue, April 2 at South Harbor Townhip Hall. Your insight is valuable in making this project a success! View draft detailed layout as PNG image (April 2024)
Summary of work
- Install a roundabout at the Hwy 27 and Hwy 169 intersection
- Reconstruct adjacent entrances:
- Realign Co. Rd. 35 (Twilight Rd.) to/from westbound Hwy 27
- Install center concrete median with 3/4 accesses to/from Hwy 169
- Install pedestrian crosswalks and approaches
Future impacts
- Hwy 169: Lane closures, lane shifts, narrow lanes; traffic will shift to either side of work zone as built
- Hwy 27: Access closed at Hwy 169
- Local: Access will be maintained; however, expect changes and use of alternate entrances, follow signs