About this project
Resurface and improve 8.5 miles of Hwy 210 from Hwy 10 in Motley to River St. (S Cass Co. Rd. 1) in Pillager; includes roundabout in Pillager. Work is scheduled for 2027.
Summary of work
Pillager
- Construct a single-lane roundabout at the intersection of Hwy 210, River St. (S Cass Co. Rd. 1) and 37th Ave.
Motley to Pillager
- Resurface road (asphalt), includes shoulders and turn lanes
- Replace box culvert east of 49th Ave. SW
- Restripe eastbound Hwy 210 to make left turn-lane to northbound Hwy 64
Layout concepts
August 2024
- Pillager roundabout (PDF)
- Image view (PNG)
- Motley to Pillager (PDF)
- Motley Hwy 210 at Hwy 64 (PDF)
Note: CADD design layouts with aerial images. Layouts subject to change as we develop this project.