Minnesota Department of Transportation

511 Travel Info

Design-Build

Hwy 2 in Beltrami County design-build completed project

SP 0406-53, Letting 06/19/09

Status

Project complete.

Project purpose, benefits

Replaced two bridges with a box culvert 0.4 miles west of TH 89. The project included bridge demolition, box culvert construction, grading, paving. Estimated cost: $2.5 to $3.5 million.