Washington St.—Brainerd

Hwy 210 from Baxter Dr. to Pine Shores Rd., Crow Wing County

Know before you go: check 511mn.org

Current work zone

Construct east mall segment through early August

Hwy 210 - 10th Ave. NE to Fifth Ave. NE

Reconstruct the mall segment (PNG) with two new roundabouts in the Select work zone map to enlarge (PNG)
Motorists
Pedestrians
  • Sidewalk closures, follow detour signs

Building a better Brainerd

MnDOT will reconstruct and improve the Washington St. (Hwy 210) through Brainerd from Baxter Dr. to Pine Shores Rd. in 2026 and 2027.

Hwy 210

  • Reconstruct (mall, railyard, downtown, bridge segments) or resurface (east and west segments) the road
  • Reconstruct curbs, gutters, raised medians and storm sewers
  • Update signal systems
  • Remove signal systems at Mill Ave. and 4th Ave. NE
  • Realign and improve access at the Hwy 210 and Hwy 25/Mill Ave., includes two roundabouts
  • Upgrade city utilities beneath the road
  • Upgrade pedestrian sidewalks and approaches and reconstruct/connect the Cuyuna Lakes Trail
  • Update the Mississippi River bridge
Project location map and general segments. Select image to enlarge

Hwy 210 segments

2026 work
  • East— 10th Ave. NE to Pine Shores Rd.
  • Mall—5th Ave. E to 10th Ave. NE
  • Railyard —Kingwood St. to 5th Ave.
2027 work
  • Downtown — E River Rd./N 1st St. to Kingwood St.
  • Bridge— 4th St. NW to east of the Mississippi River at E River Rd./N 1st St.
  • West — Baxter Dr. to 4th St. NW

Work segments subject to change once more is known. More details to become available closer to construction.