MnDOT will resurface both directions of Hwy 169 between Milaca and Princeton, replace pipes and reconstruct the access at Hwy 169 and Mille Lacs Co. Rd. 8 in Pease. Expect lane closures, detours and changes to access.
Impacts
Motorists to encounter lane closures and off-road work during the full duration of this project.
Hwy 169
July 8 to mid-October
Single-lane closures to resurface both directions of Hwy 169 from south of Co. Rd. 36 in Milaca to one mile north of Co. Rd. 29 in Princeton
NB Hwy 169 open on Fridays
SB Hwy 169 open on Sundays
Southbound Hwy 169 detour
July 15 to Aug. 17
Monday-Saturdays: SB Hwy 169 closed between Hwy 23 in Milaca and Co. Rd. 13 in Long Siding
MnDOT will resurface both directions of Hwy 169 between Milaca and Princeton, replace pipes and reconstruct the access at Hwy 169 and Mille Lacs Co. Rd. 8 in Pease.
Summary of work
Pease
July 8 to mid-September
Reconstruct into a J-turn access at Hwy 169 and Mille Lacs Co. Rd. 8 (west of Hwy 169 is Main St.; east of Hwy 169 is 105th St.)
Replace stormwater pipes beneath road
Install overhead intersection lighting
Update pedestrian approaches and install a crossing in the median
Milaca to Princeton
July 29 to mid-October
Resurface both directions of Hwy 169 (mill and overlay asphalt) between half-mile south of Co. Rd. 36 in Milaca and one mile north of Co. Rd. 29/N Rum River Rd. in Princeton, includes shoulders and turn lanes
Replace or repair pipes beneath southbound Hwy 169
About J-turns
Improve access and safety
J-turn intersections decrease fatalities and injuries caused by broadside crashes on four-lane divided highways, like Hwy 169. Drivers always make a right turn, followed by a J-turn. This eliminates the wait for a gap to cross both directions, which reduces potential conflicts.
J-turns were installed at these Hwy 169 intersections in 2020:
Co. Rd. 11 north of Milaca
Co. Rd. 12 south of Pease
Co. Rd. 13 in Long Siding
How to use J-turns
Upcoming impacts
Motorists
Lane closures and changes to access
Detour plans