2025 work
These roadwork projects on state highways will have traffic impacts, but will be led, constructed and communicated by the city, township or county. Check 511mn.org for current impacts on these projects.
2025 roadwork
Improve drainage at Hwy 371 and Design Rd. in Baxter
- Construct: 2025
- Impacts: Access detours at Design Rd. Lane or shoulder closures on Hwy 371.
- Led by: City of Baxter
Construct roundabout

Update and improve access at the intersection with a new roundabout at Hwy 371B (S 6th St.) and Willow St. in Brainerd, Crow Wing Coutny (city led)
- Construct: June-August 2025
- Impacts: Intersection closed Hwy 371B between Joseph St. and Vine St.; Willow Street between Vine St. and 7th St.
- Local detour for those who live, work or visit those in the neighborhood
- Truck detour for through traffic, larger, longer vehicles, RV's and semi-trucks
- Led by: City of Brainerd

Improve access
Sherburne County to update access and improve safety along Hwy 10, east of St. Cloud, near Haven Town Hall, as follows:
- Update access on Hwy 10 at Co. Rd. 65 (42nd St. SE) and Co. Rd. 7 (45th Ave. SE) with a J-turn design
- Reconfigure access on Hwy 10 at Co. Rd. 61 (47th St. SE) with a right in/out design; includes an acceleration lane
- Construct: 2025
- Impacts: Lane or shoulder closures on Hwy 10; local access changes, follow road signs
- Estimated cost: $3 million
- Led by: Sherburne County
Construct interchange
Construct new interchange at Hwy 169 and Co. Rd. 4 (Freemont Ave.) in Zimmerman
- Construct: June 2025-November 2026
- Local roads and preperation work in 2026
- Hwy 169 and local roads in 2027
- Impacts: Latest project email updates
- Estimated cost: $5.8 million
- Led by: Sherburne County
Improve access
Construct right turn-lane on Hwy 25 to 14th St NE in Buffalo
- Construct: 2025
- Impacts: Lane or shoulder closure on Hwy 25; local access changes to 14th St. NE
- Estimated cost: $200,000
- Led by: City of Buffalo
Improve access at interchange
Construct roundabouts at the I-94 interchange on/off ramps and Co. Rd. 137
- Construct: 2025
- Impacts: Lane or shoulder closures on Hwy 169; Impacts on local roads. Communicated through the I-94 Gap—Albertville to Monticello project
- Estimated cost: $5.8 million
- Led by: Wright County