Increasing the transparency of how we select highway construction projects

Non-National Highway System bridge projects

MnDOT District 4

How the projects scored in 2019

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated December 2019

Score Bridge number Route Key Intersection or Closest landmark Work Type  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
90 6459 US 75 Mustinka River Replace $1,300,000 2020
90 5480 MN55 Pomme De Terre River Replace $600,000 2021
70 5025 US 59 Pelican River Reoverlay deck Surface $100,000 2025
65 9313 US 75 Rabbit River Replace $3,000,000 2023 Selected prior to policy (in 2019-2022 STIP)
45 9027 MN29 Chippewa River Replace $3,000,000 2023 Selected prior to policy (in 2019-2022 STIP)
20 6686 MN 9 Mustinka River Replace $600,000 2022 Selected prior to policy (in 2019-2022 STIP)