Summary of work
Pavement rehabilitation (mill and overlay and concrete joint repair).
St. Louis County
Pavement rehabilitation (mill and overlay and concrete joint repair).
When MnDOT hosted a public meeting in Chisholm on June 10, we talked about the construction project coming in 2027. This includes looking at the intersection of Hwy 73/Lake Street and 3rd Avenue Northwest. While MnDOT is studying all possibilities at the intersection, it was suggested we conduct a demonstration project to see how a 4-way stop would function in place of signal lights. We support this idea and are coordinating the demonstration project for approximately one month, beginning mid-August.
We chose this time period to accommodate larger traffic volumes from the holiday weekend and the start of school. The existing signal lights will blink red from all four directions during this time period, so we can study how traffic functions through the intersection and how pedestrians navigate the intersection.
Temporary curb bumpouts will also be installed during this timeframe. Bumpouts create a shorter distance for pedestrians to cross an intersection.