About the project
MnDOT is planning to reconstruct Hwy 89 between Hwy 11 and south of Seventh St. in Roseau. The project is in the design phase and plans for construction looks to be between 2026 and 2028. As MnDOT works towards the final design and estimated costs, a construction year will be selected.
Current conditions
The project aims to provide an urban curb and gutter section similar to Hwy 11. It will also address several deficiencies, including:
- Motorist safety
- Bicyclist and Pedestrian safety
- Intersection alignment and control
- Roadside drainage
- Nighttime visibility at the roundabouts
- Pedestrian crossings and accessibility
- Access location efficiency
This project is separate from the 20-mile improvement project on Hwy 11 between Roseau and Warroad in 2026, and a 1-mile resurfacing and bridge improvement project on Hwy 11 to the east of Roseau in 2025.