Project complete
Highway 9, from Barnesville to Interstate 94, was expected to be in poor condition by 2022, increasing the resource needs from maintenance. The majority of sidewalk and pedestrian ramps in Barnesville were not noncompliant and were repaired or replaced as part of this project.
The project included resurfacing and accessibility improvements to sidewalks and ramps, resulting in a more narrow roadway upon completion in order to meet roadway standards and pedestrian accessibility compliance.
Key project elements
- Reconstruction of Highway 9 from railroad crossing to Highway 34
- Eliminating two of the three railroad tracks crossing Highway 9 and relocating signals
- City utility replacement between Main Avenue and Highway 34
- Construct trail on east side of Highway 9, from Main Avenue to Highway 34 (Funded via TAP)
- Resurfacing of Highway 9 between Highway 34 and I-94
- Turn lanes at CR 55, on west of side Highway 9
Project impacts
- See the latest construction information and updates
- Construction was completed in phases
- Phase 1 (Highway 34 to Main Avenue)
- Phase 2 (Front Street to Fourth Avenue)
- Phase 3 (Highway 34 to I-94)