Summary of work

In 2025, Hwy 14 (12th St. South) will be resurfaced in Rochester from Hwy 52 to Crossroads Dr. SW and from 3rd Ave. SE to Marion Rd. SE/15th Ave. SE. Construction is scheduled May 5 to August 2025.
This project will improve the driving experience and pedestrian mobility, and extend the service life of the highway.
A layout of the planned improvements is available for review.
Sidewalk repairs, replacements and installations
- Instal new sidewalk east of Memorial Pkwy. SW from trail to Hwy 14 and Memorial Pkwy. SW intersection
- Repair panels from 3rd Ave. SE to Marion Rd. Some may be replaced
- Install new sidewalk south side of Hwy 14 from 11th Ave. SE to Bear Creek Park access
- Improve sidewalk and trail connections at the bridge over South Fork Zumbro River
Crosswalk improvements
- New crossing at Apache Dr.
- New crosswalks at 7th Ave. SE, 6th Ave. SE, 9th Ave. SE and 10th Ave. SE
- Improvements to existing crosswalks at 5th Ave. SE and 9.5 Ave. SE
- Improved pedestrian connectivity from north to south
- New ramps and pedestrian crossing at 3rd Ave. SE and Crossroads Dr. SW
- New pedestrian crossing from Bear Creek Park to Cub Foods
- New ADA pedestrian ramps at Marion Rd.
Bike improvements
- Upgrades to the bike connection from Bear Creek Trail system to Hwy 14
- Sidewalks connections at the bridge over South Fork Zumbro River
Hwy 14 and Broadway Ave.
Following this project, the Hwy 14 and Broadway Ave. intersection in Rochester will receive safety improvements in 2027.
MnDOT and the City of Rochester are looking into changes to reduce crashes and improve crossings for pedestrians and bicyclists. Additional information is available on the project website.