About this project

Summary of work
Construction is scheduled in 2028 along Highway 43 in Winona from Mankato Avenue to Winona Street. Highway 43 through Winona is also East Sarnia Street to Main Street to East Fourth Street. The route will include a repaving of the road, a three-lane section, improved bicycle lanes, sidewalks, crossing and signals.
Traffic impacts
- Lane closures during resurfacing
- Local pedestrian and bicycle route detours
- Local street detours during intersection work