About this project
Approximately nine miles of Hwy 15 from Martin County Road 54 to the south interchange of Hwy 15/Hwy 60 will be resurfaced in 2023.
Summary of work
- Resurface the roadway
- Install lighting at the following intersections with Hwy 15:
- CR 8/CR 107
- CR 10 (west of Hwy 15)/CR 126
- CR 10 (east of Hwy 15)
- Repair culverts
- Install snow fence
Traffic Impacts
Project will be primarily constructed under traffic. Motorists can expect flagging operations during construction.
Ramp work at the Hwy 15/Hwy 60 interchange will require detours for WB Hwy 60 to SB Hwy 15, and NB Hwy 15 to WB Hwy 60 (see map for detour routes).