About this Study
Hwy 22/Dodd Road study area (view full-size map)
MnDOT partnered with the City of St. Peter on a Corridor Study of Hwy 22 (Dodd Road) from Hwy 169 to Nicollet County Road 20. A traffic study and engineering analysis along with community input identified potential improvements that will be part of a future MnDOT project.
Goals of Hwy 22 Corridor Study
- Identify opportunities to improve safety and traffic flow at intersections
- Determine current and future bicycle, pedestrian, and transit needs
- Outline aesthetic opportunities
- Provide recommendations for current highway accesses, as it relates to balancing safety and local business accessibility
Final Report
The Hwy 22 Corridor Study was completed in 2023. The final report of findings, alternatives, and recommendations for a future project can be found here:

