About this project
Summary of work
- Resurface Hwy 212 from 2.3 miles east of Hwy 23 to CR 6 in Renville.
- Reconstruct Hwy 212 through Sacred Heart; sidewalks, pedestrian ramps and adjacent driveways will be upgraded to meet Americans with Disabilities (ADA) standards.
- Two storm water ponds are planned as part of storm sewer upgrades.
- A westbound passing lane between Granite Falls and Sacred Heart will also be constructed as part of the project (see work zone map below).
Project update
Oct. 27, 2023
- This project is complete.