Traffic impacts
All traffic impacts are tentative and weather dependent. Access to all businesses will be maintained during construction.
Upcoming
Information about upcoming traffic impacts will be posted as details become available.
About this project
In 2024, we will resurface Hwy 36 from I-35W in Roseville to Edgerton St. in Little Canada and make additional improvements. Resurfacing of aging pavement on Hwy 36 will provide a smoother ride for motorists and extend the life of the existing roadway. A new auxiliary lane from SB I-35W to EB Hwy 36 will provide more distance for drivers to safely merge onto EB Hwy 36 which will ease traffic flow and reduce congestion. Reconstruction of the ramp from NB Cleveland Ave. to EB Hwy 36 and extending the merge lane onto EB Hwy 36 will provide more time for drivers to safely merge into traffic. Improved drainage will also help channel water to prevent pavement damage from flooding and weather events.
Summary of work
- Resurface Hwy 36 pavement
- Repair and replace aging drainage
- Install new traffic signs
- Replace guardrail
- Ramp reconstruction
- Build a new dedicated auxiliary lane from SB I-35W to EB Hwy 36 to improve vehicle merging
- Reconstruct NB Cleveland Ave. to EB Hwy 36 ramp and add a new merge lane to improve merging
- Upgrade sidewalks to meet ADA requirements
- Concrete pavement repair to the ramps between Hwy 36 and Edgerton St.
- Resurface ramps at the following cross streets along Hwy 36:
- Fairview Ave. (remaining parts of the ramps that were not resurfaced during the 2023 project)
- Snelling Ave.
- Hamline Ave.
- Dale St.
- Rice St.
- SB I-35E to WB Hwy 36
- WB Hwy 36 to NB I-35E