Documents
Environment Assessment documents
MnDOT published the Environmental Assessment/Environmental Assessment Worksheet for the Blatnik Bridge replacement project to the Minnesota Environmental Quality Board for public comment from Sept. 19-Oct. 19, 2023. Comments made during this period have been added to the project administrative record and will be considered by the project team for a determination as to the adequacy of the environmental documentation. A summary of all comments received and how they have been considered will be prepared in a Findings of Facts and Conclusion Document, which will be distributed in early 2024. A public hearing was also held on Oct. 3, and a presentation on the materials can be viewed below
- Blatnik Bridge Replacement Project EA-EAW_20230912
- Appendix A. Build Alternative Layouts
- Appendix B. Agency Correspondence
- Appendix C. Draft Section 106 Programmatic Agreement
- Appendix D. De Minimus Notice
- Appendix E. Purpose and Need Statement Technical Memo
- Appendix F. Alternatives Development Report
- Appendix G. Wetland 2-Part Finding
- Appendix H. Visual Impact Assessment
- Appendix I. Interstate Access Modification Request NEPA Policy Points
- Appendix J. Environmental Justice Standard Attachment
- Appendix K. Right-of-Way Impact Maps and Relocation Plan