Minnesota Department of Transportation

511 Travel Info

Highway 135 Biwabik bridge repair

Traffic impacts

Traffic will be restricted to a single lane controlled by a signal system starting on May 12. Work is expected to last until the end of June.

A rendering of the location of the bridge to be repaired on Hwy 135 in Biwabik

Click image for full-size image

 

About this project

Summary of work

Repair damaged bridge over rail lines on Hwy 135.