About this project
Summary of work
MnDOT is studying the Hwy 169 corridor through Hibbing from Hwy 37 to 13th Street East. In this stretch, there are 4 signalized intersections, 6 partial controlled intersections and more access points.
There was also an Intersection Control Evaluation conducted at the Hwy 169 and 37th Street intersection. The traffic signal at this location needs to be replaced.