Hwy 115—Randall to Camp Ripley

Morrison County

About this 2024 project

MnDOT will resurface and improve Hwy 115 from east of Hwy 10 in Randall to the Mississippi River bridge east of Morrison Co. Rd 213. The project will require a detour to replace pipes.

Hwy 115 location map
2024 roadwork on Hwy 115 Randall to Camp Ripley. Detour for pipe work. Select image to enlarge

Summary of work

  • Resurface road from Hwy 10 to the east entrance of Camp Ripley
  • Replace four pipes at:
  • A) East of 95th Ave.
    B) East if Co. Rd. 208
    C) East of Co. Rd. 13
    D) West of Co. Rd. 213

  • Upgrade pedestrian sidewalks at Camp Ripley’s main entrance at Co. Rd. 213 (Grouse Rd.)
  • Upgrade guardrail
  • Future impacts

    • Lane or shoulder closures
    • Motorists to encounter segments of alternate one lane, one way traffic, flaggers and use of a pilot car. Be prepared to slow down, stop and wait.
    • Detour for pipe work: Hwy 10 Randall and Morrison Co. Rd. 76 (Haven Rd.) Little Falls