About this 2024 project
Begins July 8
MnDOT will resurface and update the Hwy 25 bridge over the Mississippi River in Monticello, includes drainage and sidewalks. Expect delays on Hwy 25 in Monticello July 8 through late October 2024.
Latest news
- Sign up for 2024 Hwy 25 Monticello construction email updates
- Latest project update sent June 25, 2024
Summary of work
- Resurface the Hwy 25 bridge deck (replace concrete wearing coarse)
- Replace approach panels and joints, along with other bridge repairs
- Widen sidewalks along both sides of the bridge
- Upgrade lighting
- Replace or repair drainage infrastructure