About this project

Summary of work
Construction began July 10 and was completed Sept. 14, 2023. The following improvements were made:
- Resurfaced approximately 8.8 miles of I-35 southbound from 0.5 miles north of Hwy 30 to 0.5 miles south of Steele Co. Rd. 31
- Installed Weigh-in-Motion system (WIM) which captures and records the axle weights and gross weights of vehicles
- Installed a Road Weather Information System (RWIS)