MnDOT District 8

Scoring criteria for national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on network designation, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in Hwy SHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated August 2024

Total Score Route Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
88 US12 Resurface Hwy 12 from Holcombe Ave in Litchfield to CR 14 in Darwin.  $       2,843,733 2025 NA
83 US71, Hwy 23 Resurface SB lane of Hwy 71 from south end of Hwy 23 bypass to the Business 71 split & resurface Hwy 23 from CR 5 to start of Hwy 23 bypass.  $     22,000,000 2025 NA
83 US71 Reconstruct northbound Hwy 71 from the N Busness 71 split to north jct of Hwy 23 (Belgrade/Spicer split).  $       8,000,000 2028 NA
79 US71 Resurface Hwy 71 from CR 115 in Sanborn to the south jct of Hwy 68.  $     14,170,000 2030/2031 NA
78 Hwy 23 Resurface (concrete) Hwy 23 from 2 miles north of Hwy 91 to Tiger Drive in Marshall.  $       7,890,000 2031/2032 NA
77 US212 Major concrete rehabilitation from Highway 23 (Granite Falls) to east of Highway 23  $       8,600,000 Not Selected The district is currently prioritizing other concrete segments that have not yet received a rehabilitation
77 US71 Major rehabilitation from US212 to Hwy 7  $       4,800,000 Not Selected Project not selected due to the previous fix being a minor CPR in 2018; it is expected that the average life of those repair are approx. 15 years. This project will be reconsidered approx. 2033
77 US212 Resurface Hwy 212 from Danube to Olivia.  $       3,800,000 Not Selected NA
75 US12 Resurface Hwy 12 from 6th Street SE to 0.1 miles E. of 23rd Street SE in Willmar.  $     10,700,000 2031 NA
75 US12 Resurface (concrete) Hwy 12 from CR 14 in Darwin to Pittman Ave in Cokato; upgrade sidewalks in Darwin to meet ADA standards.  $     11,162,891 2025/2026 NA
75 US14 Resurface Hwy 14 from south jct of Hwy 75 in Lake Benton to the Lincoln/Lyon county line; upgrade sidewalks in Lake Benton to meet ADA standards.  $     14,588,100 2027/2028 NA
75 Hwy 22 Resurface Hwy 22 from Hwy 12 to Eden Valley.  $       9,300,000 2032/2033 NA
75 US212 Cold in place recycling and medium overlay from Renville County Road 16 to McLeod County Road 7  $       3,700,000 Not Selected NA
75 Hwy 15 Thin mill and overlay from Highway 212 (Brownton) to Hutchinson  $       3,200,000 Not Selected Candidate for Preventative Maintenance work in 2024
74 US71 Major rehabilitation rom Cottonwood/Redwood County line to 120th st in Sanborn  $           900,000 Not Selected Project not selected due to short length (2 miles); this pavement section continues south into District 7. This project will be selected when District 7 schedules a project.
73 Hwy 7, Hwy 22 Resurface (concrete) Hwy 7 from Technology Drive to 0.24 miles west of CR 2 in Silver Lake; resurface Hwy 22 from Hwy 7 to 0.6 miles south of Airport Road.  $       8,900,000 2027 NA
73 Hwy 19 Resurface (concrete) Hwy 19 from Redwood Falls to Morton; resurface (concrete) Hwy 71 from Hwy 19 to CR 15.  $       6,970,000 2032/2033 NA
72 US59 Resurface Hwy 59 from Hwy 14 to CR 6 in Marshall.  $       9,100,000 2028 NA
71 US71 Resurface Hwy 71 from Hwy 68 to CR 101 in Redwood Falls.  $       8,900,000 2028 NA
71 Hwy 15 Medium overlay from Hutchinson to Highway 12 (Dassel)  $       6,400,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
71 US12 Medium overlay from Kerkhoven to Pennock  $       3,800,000 Not Selected Candidate for preventive maintenance work in 2025
70 Hwy 15 Reclaim and overlay from Highway 12 (Dassel) to Meeker/Stearns County Line  $       8,400,000 Not Selected NA
70 Hwy 23 Thin mill and overlay Highway 19 (Marshall) to Lyon County Road 33  $       1,200,000 Not Selected NA
69 US59 Medium overlay Highway 30 (Slayton) to north junction of Highway 30  $       3,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
69 US212 Minor concrete pavement rehab and diamond grinding from Olivia to Bird Island  $       1,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
68 US14 Resurface Hwy 14 from Minnesota/South Dakota state line to Lake Benton.  $       9,400,000 2031 NA
67 Hwy 7 Resurface Hwy 7 from Hwy 71 to Hwy 4.  $     13,600,000 2032 NA
67 US71 Medium mill and overlay from Highway 19 (Morton) to Olivia  $       7,500,000 Not Selected NA
67 Hwy 23 Medium mill and overlay from Rock/Pipestone County Line (Jasper) to Highway30 (Pipestone)   $       5,700,000 Not Selected NA
65 US71 Resurface Hwy 71 from Morton to Olivia.  $     16,400,000 Not Selected NA
65 US14 Medium overlay from Revere to Redwood/Brown County Line  $       6,300,000 Not Selected NA
64 Hwy 7 Reclaim and overlay from Highway 40 (Milan) to Montevideo  $     12,100,000 2033/2034 NA
62 Hwy 23 Resurface Hwy 23 from Hwy 75 to 2 miles north of Hwy 91; resurface bridge deck in Pipestone.  $     10,900,000 2024/2025 NA
60 Hwy 7, Hwy 29 Resurface Hwy 7 from Hwy 29 to 0.5 miles east of CR 15; resurface Hwy 29 from bridge 12016 to east jct of Hwy 7 in Montevideo.  $       3,200,000 2028 NA
58 Hwy 15 Reclaim and overlay from Hwy 19 to US212  $       4,600,000 Not selected NA
56 US71 Concrete reconstruction from Highway 23 to Willmar Bypass  $       7,900,000 Not Selected NA
53 US59 Reconstruction from Highway 68 (Marshall) to Lyon County Road 33  $       8,900,000 Not Selected NA
48 US71 Resurface Hwy 71 from Hwy 7 to Willmar.  $       6,700,000 2032 NA
48 US71 Cold in place recycling and medium overlay from Hwy 7 to Hwy 23  $       2,500,000 Not selected NA
46 US212 Minor CPR and diamond grinding from Hwy 22 to Morningside Dr  $       1,400,000 Not selected NA
45 US212 Unbonded overlay from Morningside Dr to Hwy 5  $     12,400,000 Not selected NA
44 US212 Minor CPR and diamond grinding from US75 to .5 miles west of Hwy 29 (excluding Dawson)  $       3,400,000 Not selected NA
43 Hwy 22 Resurface Hwy 22 from Glencoe to Hutchinson.  $       7,000,000 2033/2034 NA
43 Hwy 22 Cold in place recycling and medium overlay from Cedar Ave to McLeod County Road 115  $       2,600,000 Not selected NA
42 US212 Resurface Hwy 212 from 0.1 miles W of N Jct Hwy 71 to S Jct Hwy 71 in Olivia.  $       1,500,000 2024 NA
40 US12 Thin overlay from Highway 22 to Highway 24 (Litchfield)  $           200,000 Not Selected NA
39 US12 Concrete reconstruction from Highway 71 to Kandiyohi/Meeker County Line  $     58,300,000 Not Selected NA
37 US59 Thin overlay from Nobles/Murray County Line to Highway 62 (Fulda)  $           400,000 Not Selected NA
37 Hwy 15 Thin overlay from Meeker County Road 18 to south of US12  $           200,000 Not selected NA
37 US71 Thin overlay from Kandiyohi County Road 93 to Hwy 23  $           100,000 Not selected NA
36 US71 Thin overlay from Quality Drive (Redwood Falls) to Highway 71 and additional locations on Highway 71  $       1,300,000 Not Selected NA
36 US12 Thin mill and overlay from 25th St. SE (Willmar) to Highway 71  $           400,000 Not Selected NA
35 Hwy 7 Thin overlay from the end of bridge 8518 to Carver County Road 33  $           100,000 Not selected NA
33 Hwy 23 Major CPR and diamond grinding from .1 mile south of Hwy 7 to .3 miles north of Hwy 7  $           200,000 Not selected NA
31 US14 Resurface Hwy 14 from Revere to Hwy 71.  $       7,600,000 2029 NA
31 US14 Thin overlay from Redwood  County Road 7 to Main St   $           100,000 Not selected NA
30 US59 Thin overlay from .6 miles south of Hwy 62 to Hwy 62  $           100,000 Not selected NA
20 US212 Thin overlay eastbound from west of Highway 5 to Highway 5  $           100,000 Not Selected NA
12 US59 Thin overlay from Murray County Road 6 to 1st St  $           100,000 Not selected NA
8 Hwy 15 Minot CPR and diamond grinding from north of High Dr/County Road 15 to north of High Drive  $           100,000 Not selected NA
8 Hwy 7 Thin mill and overlay on Highway 7 & Highway 25 Roundabout  $           100,000 Not Selected NA
8 US71 Thin overlay on Highway 71 & Highway 7 Roundabout  $           100,000 Not Selected NA
7 Hwy 15 Thin overlay on Highway 19 (Winthrop) to north of Highway 19  $           100,000 Not Selected NA
6 Hwy 7 Thin overlay from Swift Chippewa County Line to Hwy 40  $           500,000 Not selected NA
6 Hwy 7 Minor concrete pavement rehab and diamond grinding at the intersection of Highway 23 & Highway 7 (Clara City) - approx. 1000 feet on each leg  $           300,000 Not Selected NA

Previous years

View more detailed scores (Excel).

Total Score Route Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
83 US71 Rural reconstruction from Highway 23 to Willmar Bypass and additional locations on Highway 71 $25,000,000 2028 NA
79 Hwy 23 Medium mill and overlay from Highway 75 (Pipestone) to north of Highway 91 (Russel) $13,400,000 2024 NA
79 US71 Reclaim and overlay from Redwood County Road 115 (Sanborn) to Highway 68 $8,800,000 2027 NA
78 Hwy 23 Major concrete rehabilitation from north of Highway 91 (Russel) to Highway 19 (Marshall) $20,400,000 2029 NA
77 US212 Major concrete rehabilitation from Highway 23 (Granite Falls) to east of Highway 23 $8,600,000 Not Selected The district is currently prioritizing other concrete segments that have not yet received a rehabilitation
75 Hwy 15 Thin mill and overlay from Highway 212 (Brownton) to Hutchinson $3,200,000 Not Selected Candidate for Preventative Maintenance work in 2024
75 US14 Medium overlay and cold in inplace recycling from Lake Benton to Lincoln/Lyon County Line $5,200,000 2027 NA
75 US12 Major concrete pavement rehabilitation from Darwin to Cokato $10,700,000 2024 NA
75 US212 Medium overlay from Renville County road 16 to Renville County Road 7 $3,700,000 2030 NA
73 Hwy 7 Major concrete rehabilitation from Hutchinson to Silver Lake, and from McLeod County road 25 to  Highway 7 (Hutchinson Bypass) $9,200,000 2028 NA
72 US59 Medium overlay from Highway 14 to Lyon County Road 6 (Marshall) $5,900,000 2028 NA
71 Hwy 15 Medium overlay from Hutchinson to Highway 12 (Dassel) $6,400,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
71 US71 Reclaim and overlay from Highway 68 to Redwood Falls $6,800,000 2029 NA
71 US12 Medium overlay from Kerkhoven to Pennock $3,800,000 Not Selected Candidate for preventive maintenance work in 2025
70 Hwy 15 Reclaim and overlay from Highway 12 (Dassel) to Meeker/Stearns County Line $8,400,000 2023 This section has been prioritized because maintenance patching is losing effectiveness.
70 US14 Medium mill and overlay from Highway 23 to Tracy $9,400,000 2027 NA
70 Hwy 23 Thin mill and overlay Highway 19 (Marshall) to Lyon County Road 33 $1,200,000 2027 This section has been prioritized because a thin mill and overlay will improve performance.
69 US59 Medium overlay Highway 30 (Slayton) to north junction of Highway 30 $3,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
69 US212 Minor concrete pavement rehab and diamond grinding from Olivia to Bird Island $1,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
68 US14 Thin mill and overlay from Minnesota/South Dakota County line to US75 $1,400,000 2029 NA
67 Hwy 23 Medium mill and overlay from Rock/Pipestone County Line (Jasper) to Highway30 (Pipestone)  $5,700,000 Not Selected NA
67 US71 Medium mill and overlay from Highway 19 (Morton) to Olivia $7,500,000 Not Selected NA
65 US14 Medium overlay and cold in place recycling from Revere to Redwood/Brown County Line $6,300,000 Not Selected NA
64 Hwy 7 Reclaim and overlay from Highway 40 (Milan) to Montevideo $11,100,000 Not Selected NA
56 US71 Concrete reconstruction from Highway 23 to Willmar Bypass $7,900,000 Not Selected NA
53 US59 Reconstruction from Highway 68 (Marshall) to Lyon County Road 33 $8,900,000 Not Selected NA
40 Hwy 22 Concrete reconstruction from Glencoe to Hutchinson $50,600,000 Not Selected NA
40 US12 Thin overlay from Highway 22 to Highway 24 (Litchfield) $200,000 Not Selected NA
39 US12 Concrete reconstruction from Highway 71 to Kandiyohi/Meeker County Line $58,300,000 Not Selected NA
37 US59 Thin overlay from Nobles/Murray County Line to Highway 62 (Fulda) $400,000 Not Selected NA
36 US71 Thin overlay from Quality Drive (Redwood Falls) to Highway 71 and additional locations on Highway 71 $1,300,000 Not Selected NA
36 US12 Thin mill and overlay from 25th St. SE (Willmar) to Highway 71 $400,000 Not Selected NA
20 US212 Thin overlay eastbound from west of Highway 5 to Highway 5 $100,000 Not Selected NA
8 Hwy 7 Thin mill and overlay on Highway 7 & Highway 25 Roundabout $100,000 Not Selected NA
8 US71 Thin overlay on Highway 71 & Highway 7 Roundabout $100,000 Not Selected NA
7 Hwy 15 Thin overlay on Highway 19 (Winthrop) to north of Highway 19 $100,000 Not Selected NA
6 Hwy 7 Minor concrete pavement rehab and diamond grinding at the intersection of Highway 23 & Highway 7 (Clara City) - approx. 1000 feet on each leg $300,000 Not Selected NA
Hwy 19 and US71 Major rehabilitation on Hwy 19 from Qualit Dr to Centennial Dr and on US71 from Hwy 19 to Renville County Road 19 $3,000,000 2030 NA

 

View more detailed scores (Excel).

Total Score Route Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
Total Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
88 US12 Resurface Hwy 12 from Holcombe Ave in Litchfield to CR 14 in Darwin. $2,200,000 2024 NA
84 US12 Resurface Hwy 12 from 11th St W to 6th St E in Willmar; upgrade sidewalks to meet ADA standards. $2,900,000 2028 NA
83 US71/Hwy 23 Resurface SB lane of Hwy 71 from south end of Hwy 23 bypass to the Busness 71 split; resurface NB lane of Hwy 23 from Business 71 split to north jct of Hwy 23 (Belgrade/Spicer split); resurface Hwy 23 from CR 5 to start of Hwy 23 bypass. $24,770,000 2028/2029 NA
79 Hwy 23 Medium mill and overlay from Highway 75 (Pipestone) to north of Highway 91 (Russel) $13,400,000 2024 NA
79 US71 Reclaim and overlay from Redwood Count Road 15 (Sanborn) to Highway 68 $8,800,000 2027 NA
78 Hwy 23 Major concrete rehabilitation from north of Highway 91 (Russel) to Highway 19 (Marshall) $20,400,000 2029 NA
78 Hwy 23 Resurface (concrete) Hwy 23 from 2 miles north of Hwy 91 to Tiger Drive in Marshall. $8,350,000 2029/2030 NA
77 US212 Major concrete rehabilitation from Highway 23 (Granite Falls) to east of Highway 23 $8,600,000 Not Selected The district is currently prioritizing other concrete segments that have not yet received a rehabilitation
77 US71 Major rehabilitation from US212 to Hwy 7 $4,800,000 Not Selected Project not selected due to the previous fix being a minor CPR in 2018; it is expected that the average life of those repair are approx. 15 years. This project will be reconsidered approx. 2033
75 US12 Resurface (concrete) Hwy 12 from CR 14 in Darwin to Pittman Ave in Cokato; upgrade sidewalks in Darwin to meet ADA standards. $5,300,000 2024 NA
75 US212 Resurface Hwy 212 from CR 16 to CR 7 in Stewart. $8,000,000 2031 NA
75 US14 Resurface Hwy 14 from south jct of Hwy 75 in Lake Benton to the Lincoln/Lyon county line; upgrade sidewalks in Lake Benton to meet ADA standards. $10,200,000 2027/2028 NA
75 Hwy 15 Thin mill and overlay from Highway 212 (Brownton) to Hutchinson $3,200,000 Not Selected Candidate for Preventative Maintenance work in 2024
74 Hwy 19 Resurface Hwy 19 from 280th Ave in Marshall to Hwy 67. $3,900,000 2031 NA
74 US71 Major rehabilitation from Cottonwood/Redwood County line to 120th st in Sanborn $900,000 Not Selected Project not selected due to short length (2 miles); this pavement section continues south into District 7. This project will be selected when District 7 schedules a project.
73 Hwy 7/Hwy 22 Resurface (concrete) Hwy 7 from Hwy 22 to Silver Lake; resurface Hwy 22 from CR 115 to Shady Ridge Rd. $6,000,000 2027 NA
73 Hwy 19 Resurface (concrete) Hwy 19 from Redwood Falls to Morton; resurface (concrete) Hwy 71 from Hwy 19 to CR 15. $5,400,000 2031 NA
72 US59 Resurface Hwy 59 from Hwy 14 to CR 6 in Marshall. $5,700,000 2028 NA
71 US71 Resurface Hwy 71 from Hwy 68 to CR 101 in Redwood Falls. $10,300,000 2029/2030 NA
71 Hwy 15 Medium overlay from Hutchinson to Highway 12 (Dassel) $6,400,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
71 US12 Medium overlay from Kerkhoven to Pennock $3,800,000 Not Selected Candidate for preventive maintenance work in 2025
70 Hwy 15 Reclaim and overlay from Highway 12 (Dassel) to Meeker/Stearns County Line $8,400,000 2023 This section has been prioritized because maintenance patching is losing effectiveness.
70 Hwy 23 Thin mill and overlay Highway 19 (Marshall) to Lyon County Road 33 $1,200,000 2028 This section has been prioritized because a thin mill and overlay will improve performance.
70 US14 Resurface Hwy 14 from Lincoln/Lyon county line to 4th St E in Tracy; upgrade sidewalks in Tracy to meet ADA standards. $12,600,000 2029/2030 NA
69 US59 Medium overlay Highway 30 (Slayton) to north junction of Highway 30 $3,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
69 US212 Minor concrete pavement rehab and diamond grinding from Olivia to Bird Island $1,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
68 US14 Resurface Hwy 14 from Minnesota/South Dakota state line to Lake Benton. $1,600,000 2030 NA
67 US71 Medium mill and overlay from Highway 19 (Morton) to Olivia $7,500,000 Not Selected NA
67 Hwy 23 Medium mill and overlay from Rock/Pipestone County Line (Jasper) to Highway30 (Pipestone)  $5,700,000 Not Selected NA
65 US14 Medium overlay from Revere to Redwood/Brown County Line $6,300,000 Not Selected NA
64 Hwy 7 Resurface Hwy 7 from Milan to Montevideo. $14,500,000 2031/2032 NA
60 US212 Resurface Hwy 212 from 2 miles east of Hwy 23 to Renville CR 6; add passing lane; reconstruct Hwy 212 through Sacred Heart. $19,900,000 2023 NA
60 Hwy 7/Hwy 29 Resurface Hwy 7 from Hwy 29 to 0.5 miles east of CR 15; resurface Hwy 29 from bridge 12016 to east jct of Hwy 7 in Montevideo. $830,000 2027 NA
58 Hwy 15 Reclaim and overlay from Hwy 19 to US212 $4,600,000 Not selected NA
53 US59 Reconstruction from Highway 68 (Marshall) to Lyon County Road 33 $8,900,000 Not Selected NA
48 US71 Resurface Hwy 71 from Hwy 7 to Willmar. $6,600,000 2032 NA
46 US212 Minor CPR and diamond grinding from Hwy 22 to Morningside Dr $1,400,000 Not selected NA
45 US212 Unbonded overlay from Morningside Dr to Hwy 5 $12,400,000 Not selected NA
44 US212 Minor CPR and diamond grinding from US75 to .5 miles west of Hwy 29 (excluding Dawson) $3,400,000 Not selected NA
43 Hwy 22 Resurface Hwy 22 from Glencoe to Hutchinson. $6,900,000 Not Selected NA
40 US12 Thin overlay from Highway 22 to Highway 24 (Litchfield) $200,000 Not Selected NA
39 US12 Concrete reconstruction from Highway 71 to Kandiyohi/Meeker County Line $58,300,000 Not Selected NA
37 US59 Thin overlay from Nobles/Murray County Line to Highway 62 (Fulda) $400,000 Not Selected NA
37 Hwy 15 Thin overlay from Meeker County Road 18 to south of US12 $200,000 Not selected NA
37 US71 Thin overlay from Kandiyohi County Road 93 to Hwy 23 $100,000 Not Selected NA
36 US71 Thin overlay from Quality Drive (Redwood Falls) to Highway 71 and additional locations on Highway 71 $1,300,000 Not Selected NA
36 US12 Thin mill and overlay from 25th St. SE (Willmar) to Highway 71 $400,000 Not Selected NA
35 Hwy 7 Thin overlay from the end of bridge 8518 to Carver County Road 33 $100,000 Not selected NA
33 Hwy 23 Major CPR and diamond grinding from .1 mile south of Hwy 7 to .3 miles north of Hwy 7 $200,000 Not selected NA
31 US14 Resurface Hwy 14 from Revere to Lamberton. $8,200,000 Not Selected NA
30 US59 Thin overlay from .6 miles south of Hwy 62 to Hwy 62 $100,000 Not selected NA
20 US212 Thin overlay eastbound from west of Highway 5 to Highway 5 $100,000 Not Selected NA
18 US59 Repair and smooth concrete pavement on Hwy 59 from 211th Street to Lyon CR 14 and from Lyon CR 6 to Hwy 23. $1,500,000 2022 NA
12 US59 Thin overlay from Murray County Road 6 to 1st St $100,000 Not selected NA
8 Hwy 15 Minor CPR and diamond grinding from north of High Dr/County Road 15 to north of High Drive $100,000 Not selected NA
8 Hwy 7 Thin mill and overlay on Highway 7 & Highway 25 Roundabout $100,000 Not Selected NA
8 US71 Thin overlay on Highway 71 & Highway 7 Roundabout $100,000 Not Selected NA
7 Hwy 15 Thin overlay on Highway 19 (Winthrop) to north of Highway 19 $100,000 Not Selected NA
6 Hwy 7 Thin overlay from Swift Chippewa County Line to Hwy 40 $500,000 Not selected NA
6 Hwy 7 Minor concrete pavement rehab and diamond grinding at the intersection of Highway 23 & Highway 7 (Clara City) - approx. 1000 feet on each leg $300,000 Not Selected NA

View more detailed scores (Excel).

Total Score Route Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
83 US71 Rural reconstruction from Highway 23 to Willmar Bypass and additional locations on Highway 71  $               25,000,000 2028 NA
79 Hwy 23 Medium mill and overlay from Highway 75 (Pipestone) to north of Highway 91 (Russel)  $               13,400,000 2024 NA
79 US71 Reclaim and overlay from Redwood County Road 115 (Sanborn) to Highway 68  $                 8,800,000 2027 NA
78 Hwy 23 Major concrete rehabilitation from north of Highway 91 (Russel) to Highway 19 (Marshall)  $               20,400,000 2029 NA
77 US71 Major CPR and diamond grinding from US212 to Hwy 7  $                 4,800,000 Not selected Project not selected due to the previous fix being a minor CPR in 2018; it is expected that the average life of those repair are approx. 15 years. This project will be reconsidered approx. 2033
77 US212 Major concrete rehabilitation from Highway 23 (Granite Falls) to east of Highway 23  $                 8,600,000 Not Selected The district is currently prioritizing other concrete segments that have not yet received a rehabilitation
75 Hwy 15 Thin mill and overlay from Highway 212 (Brownton) to Hutchinson  $                 3,200,000 Not Selected Candidate for Preventative Maintenance work in 2024
75 US14 Medium overlay and cold in inplace recycling from Lake Benton to Lincoln/Lyon County Line  $                 5,200,000 2027 NA
75 US12 Major concrete pavement rehabilitation from Darwin to Cokato  $               10,700,000 2024 NA
75 US212 Medium overlay from Renville County road 16 to Renville County Road 7  $                 3,700,000 2030 NA
74 US71 Major CPR and diamond grinding from  Cottonwood/Redwood County line to 120th St   $                     900,000 Not selected Project not selected due to short length (2 miles); this pavement section continues south into District 7. This project will be selected when District 7 schedules a project.
73 Hwy 7 and Hwy 22 Major concrete rehabilitation on Highway 7 from Hutchinson to Silver Lake, and on Highway 22 from McLeod County road 25 to  Highway 7 (Hutchinson Bypass)  $                 6,200,000 2027 NA
73 Hwy 19 and US71 Major rehabilitation on Hwy 19 from Qualit Dr to Centennial Dr and on US71 from Hwy 19 to Renville County Road 19  $                 3,000,000 2031 NA
72 US59 Cold in place recycling and medium overlay from Highway 14 to Lyon County Road 6 (Marshall)  $                 5,800,000 2028 NA
71 Hwy 15 Medium overlay from Hutchinson to Highway 12 (Dassel)  $                 6,400,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
71 US71 Reclaim and overlay from Highway 68 to Redwood Falls  $                 6,800,000 2029 NA
71 US12 Medium overlay from Kerkhoven to Pennock  $                 3,800,000 Not Selected Candidate for preventive maintenance work in 2025
70 Hwy 15 Reclaim and overlay from Highway 12 (Dassel) to Meeker/Stearns County Line  $                 8,400,000 2023 This section has been prioritized because maintenance patching is losing effectiveness.
70 US14 Medium mill and overlay from Highway 23 to Tracy  $                 9,400,000 2028 NA
70 Hwy 23 Thin mill and overlay Highway 19 (Marshall) to Lyon County Road 33  $                 1,200,000 2028 This section has been prioritized because a thin mill and overlay will improve performance.
69 US59 Medium overlay Highway 30 (Slayton) to north junction of Highway 30  $                 3,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
69 US212 Minor concrete pavement rehab and diamond grinding from Olivia to Bird Island  $                 1,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
68 US14 Thin mill and overlay from South Dakota/Minnesota State line to US75  $                 1,400,000 2029  
67 Hwy 23 Medium mill and overlay from Rock/Pipestone County Line (Jasper) to Highway30 (Pipestone)   $                 5,700,000 Not Selected NA
67 US71 Medium mill and overlay from Highway 19 (Morton) to Olivia  $                 7,500,000 Not Selected NA
65 US14 Medium overlay and cold in place recycling from Revere to Redwood/Brown County Line  $                 6,300,000 Not Selected NA
64 Hwy 7 Reclaim and overlay from Highway 40 (Milan) to Montevideo  $               11,100,000 Not Selected NA
58 Hwy 15 Reclaim and overlay from Hwy 19 to US212  $                 4,600,000 Not selected  
56 US71 Concrete reconstruction from Highway 23 to Willmar Bypass  $                 7,900,000 Not Selected NA
53 US59 Reconstruction from Highway 68 (Marshall) to Lyon County Road 33  $                 8,900,000 Not Selected NA
48 US71 Cold in place recycling and medium overlay from Hwy 7 to Hwy 23  $                 2,500,000 Not selected  
46 US212 Minor CPR and diamond grinding from Hwy 22 to Morningside Dr  $                 1,400,000 Not selected  
45 US212 Unbonded overlay from Morningside Dr to Hwy 5  $               12,400,000 Not selected  
44 US212 Minor CPR and diamond grinding from US75 to .5 miles west of Hwy 29 (excluding Dawson)  $                 3,400,000 Not selected  
43 Hwy 22 Cold in place recycling and medium overlay from Cedar Ave to McLeod County Road 115  $                 2,600,000 Not selected  
40 Hwy 22 Concrete reconstruction from Glencoe to Hutchinson  $               50,600,000 Not Selected NA
40 US12 Thin overlay from Highway 22 to Highway 24 (Litchfield)  $                     200,000 Not Selected NA
39 US12 Concrete reconstruction from Highway 71 to Kandiyohi/Meeker County Line  $               58,300,000 Not Selected NA
37 Hwy 15 Thin overlay from Meeker County Road 18 to south of US12  $                     200,000 Not selected  
37 US71 Thin overlay from Kandiyohi County Road 93 to Hwy 23  $                     100,000 Not selected  
37 US59 Thin overlay from Nobles/Murray County Line to Highway 62 (Fulda)  $                     400,000 Not Selected NA
36 US71 Thin overlay from Quality Drive (Redwood Falls) to Highway 71 and additional locations on Highway 71  $                 1,300,000 Not Selected NA
36 US12 Thin mill and overlay from 25th St. SE (Willmar) to Highway 71  $                     400,000 Not Selected NA
35 Hwy 7 Thin overlay from the end of bridge 8518 to Carver County Road 33  $                     100,000 Not selected  
33 Hwy 23 Major CPR and diamond grinding from .1 mile south of Hwy 7 to .3 miles north of Hwy 7  $                     200,000 Not selected  
31 US14 Thin overlay from Redwood  County Road 7 to Main St   $                     100,000 Not selected  
30 US59 Thin overlay from .6 miles south of Hwy 62 to Hwy 62  $                     100,000 Not selected  
20 US212 Thin overlay eastbound from west of Highway 5 to Highway 5  $                     100,000 Not Selected NA
12 US59 Thin overlay from Murray County Road 6 to 1st St  $                     100,000 Not selected  
8 Hwy 15 Minot CPR and diamond grinding from north of High Dr/County Road 15 to north of High Drive  $                     100,000 Not selected  
8 Hwy 7 Thin mill and overlay on Highway 7 & Highway 25 Roundabout  $                     100,000 Not Selected NA
8 US71 Thin overlay on Highway 71 & Highway 7 Roundabout  $                     100,000 Not Selected NA
7 Hwy 15 Thin overlay on Highway 19 (Winthrop) to north of Highway 19  $                     100,000 Not Selected NA
6 Hwy 7 Thin overlay from Swift Chippewa County Line to Hwy 40  $                     500,000 Not selected  
6 Hwy 7 Minor concrete pavement rehab and diamond grinding at the intersection of Highway 23 & Highway 7 (Clara City) - approx. 1000 feet on each leg  $                     300,000 Not Selected NA

View more detailed scores (Excel).

Total Score Route Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
83 US71 Rural reconstruction from Highway 23 to Willmar Bypass and additional locations on Highway 71 $25,000,000 2028 NA
79 Hwy 23 Medium mill and overlay from Highway 75 (Pipestone) to north of Highway 91 (Russel) $13,400,000 2024 NA
79 US71 Reclaim and overlay from Redwood County Road 115 (Sanborn) to Highway 68 $8,800,000 2027 NA
78 Hwy 23 Major concrete rehabilitation from north of Highway 91 (Russel) to Highway 19 (Marshall) $20,400,000 2029 NA
77 US212 Major concrete rehabilitation from Highway 23 (Granite Falls) to east of Highway 23 $8,600,000 Not Selected The district is currently prioritizing other concrete segments that have not yet received a rehabilitation
75 Hwy 15 Thin mill and overlay from Highway 212 (Brownton) to Hutchinson $3,200,000 Not Selected Candidate for Preventative Maintenance work in 2024
75 US14 Medium overlay and cold in inplace recycling from Lake Benton to Lincoln/Lyon County Line $5,200,000 2027 NA
75 US12 Major concrete pavement rehabilitation from Darwin to Cokato $10,700,000 2024 NA
75 US212 Medium overlay from Renville County road 16 to Renville County Road 7 $3,700,000 2030 NA
73 Hwy 7 Major concrete rehabilitation from Hutchinson to Silver Lake, and from McLeod County road 25 to  Highway 7 (Hutchinson Bypass) $9,200,000 2028 NA
72 US59 Medium overlay from Highway 14 to Lyon County Road 6 (Marshall) $5,900,000 2028 NA
71 Hwy 15 Medium overlay from Hutchinson to Highway 12 (Dassel) $6,400,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
71 US71 Reclaim and overlay from Highway 68 to Redwood Falls $6,800,000 2029 NA
71 US12 Medium overlay from Kerkhoven to Pennock $3,800,000 Not Selected Candidate for preventive maintenance work in 2025
70 Hwy 15 Reclaim and overlay from Highway 12 (Dassel) to Meeker/Stearns County Line $8,400,000 2023 This section has been prioritized because maintenance patching is losing effectiveness.
70 US14 Medium mill and overlay from Highway 23 to Tracy $9,400,000 2027 NA
70 Hwy 23 Thin mill and overlay Highway 19 (Marshall) to Lyon County Road 33 $1,200,000 2027 This section has been prioritized because a thin mill and overlay will improve performance.
69 US59 Medium overlay Highway 30 (Slayton) to north junction of Highway 30 $3,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
69 US212 Minor concrete pavement rehab and diamond grinding from Olivia to Bird Island $1,000,000 Not Selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
68 US14 Thin mill and overlay from Minnesota/South Dakota County line to US75 $1,400,000 2029 NA
67 Hwy 23 Medium mill and overlay from Rock/Pipestone County Line (Jasper) to Highway30 (Pipestone)  $5,700,000 Not Selected NA
67 US71 Medium mill and overlay from Highway 19 (Morton) to Olivia $7,500,000 Not Selected NA
65 US14 Medium overlay and cold in place recycling from Revere to Redwood/Brown County Line $6,300,000 Not Selected NA
64 Hwy 7 Reclaim and overlay from Highway 40 (Milan) to Montevideo $11,100,000 Not Selected NA
56 US71 Concrete reconstruction from Highway 23 to Willmar Bypass $7,900,000 Not Selected NA
53 US59 Reconstruction from Highway 68 (Marshall) to Lyon County Road 33 $8,900,000 Not Selected NA
40 Hwy 22 Concrete reconstruction from Glencoe to Hutchinson $50,600,000 Not Selected NA
40 US12 Thin overlay from Highway 22 to Highway 24 (Litchfield) $200,000 Not Selected NA
39 US12 Concrete reconstruction from Highway 71 to Kandiyohi/Meeker County Line $58,300,000 Not Selected NA
37 US59 Thin overlay from Nobles/Murray County Line to Highway 62 (Fulda) $400,000 Not Selected NA
36 US71 Thin overlay from Quality Drive (Redwood Falls) to Highway 71 and additional locations on Highway 71 $1,300,000 Not Selected NA
36 US12 Thin mill and overlay from 25th St. SE (Willmar) to Highway 71 $400,000 Not Selected NA
20 US212 Thin overlay eastbound from west of Highway 5 to Highway 5 $100,000 Not Selected NA
8 Hwy 7 Thin mill and overlay on Highway 7 & Highway 25 Roundabout $100,000 Not Selected NA
8 US71 Thin overlay on Highway 71 & Highway 7 Roundabout $100,000 Not Selected NA
7 Hwy 15 Thin overlay on Highway 19 (Winthrop) to north of Highway 19 $100,000 Not Selected NA
6 Hwy 7 Minor concrete pavement rehab and diamond grinding at the intersection of Highway 23 & Highway 7 (Clara City) - approx. 1000 feet on each leg $300,000 Not Selected NA
Hwy 19 and US71 Major rehabilitation on Hwy 19 from Qualit Dr to Centennial Dr and on US71 from Hwy 19 to Renville County Road 19 $3,000,000 2030 NA

View more detailed scores (Excel).

Score Route Description  High level construction cost estimate for Planning Purposes  Year Planned (FY) Comments
81 US71 Reconstruction of Willmar Bypass $25,000,000 2028  
77 Hwy 23 Medium mill and overlay from Highway 75 (Pipestone) to north of Highway 91 (Russell) $13,500,000 2024  
77 US71 Reclaim and overlay from Redwood County Road 15 (Sanborn) to Highway 68 $8,800,000 2026  
76 Hwy 23 Major concrete rehabilitation from north of Highway 91 (Russell) to Highway 19 (Marshall) $20,000,000 2029  
75 US212 Major concrete rehabilitation from Highway 23 (Granite Falls) to east of Highway 23 $8,600,000 Not selected The district is currently prioritizing other concrete segments that have not yet received a rehabilitation
73 US12 Major concrete pavement rehabilitation from Darwin to Cokato $10,700,000 2024 NA
73 US14 Medium overlay from Lake Benton to Lincoln/Lyon County Line $5,100,000 2027 NA
73 Hwy 15 Thin mill and overlay from Highway 212 (Brownton) to Hutchinson $3,200,000 Not selected Candidate for preventive maintenance work in 2024
71 Hwy 7 Major concrete rehabilitation from Hutchinson to Silver Lake and from McCleod County Road 25 to Highway 7 (Hutchinson Bypass) $9,200,000 2028 NA
70 US59 Medium overlay from Highway 14 to Lyon County Road 6 (Marshall) $5,900,000 2028 NA
69 US71 Reclaim and overlay from Highway 68 to Redwood Falls $6,700,000 2029 NA
69 Hwy 15 Medium overlay from Hutchinson to Highway 12 (Dassel) $6,300,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
69 US12 Medium overlay from Kerkhoven to Pennock $3,700,000 Not selected Candidate for preventive maintenance work in 2025
68 Hwy 15 Reclaim and overlay from Highway 12 (Dassel) to Meeker/Stearns County Line $8,400,000 2023 This section has been prioritized because maintenance patching is losing effectiveness.
68 US14 Medium mill and overlay from Highway 23 to Tracy $9,400,000 2027 NA
67 US59 Medium overlay Highway 30 (Slayton) to north junction of Highway 30 $2,900,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
67 US212 Minor concrete pavement rehab and diamond grinding from Olivia to Bird Island $1,000,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
66 Hwy 23 Thin mill and overlay Highway 19 (Marshall) to Lyon County Road 33 $1,200,000 2027 NA
65 Hwy 23 Medium mill and overlay from Rock/Pipestone County Line (Jasper) to Highway 30 (Pipestone)  $5,700,000 Not selected NA
65 US71 Medium mill and overlay from Highway 19 (Morton) to Olivia $7,500,000 Not selected NA
63 US14 Medium overlay from Revere to Redwood/Brown County Line $6,300,000 Not selected  
62 Hwy 7 Reclaim and overlay from Highway 40 (Milan) to Montevideo $11,000,000 Not selected  
54 US71 Reconstruction from Highway 23 to Willmar Bypass $7,900,000 Not selected  
51 US59 Reconstruction from Highway 68 (Marshall) to Lyon County Road 33 $8,900,000 Not selected  
38 Hwy 22 Reconstruction from Glencoe to Hutchinson $50,000,000 Not selected  
38 US12 Thin overlay from Highway 22 to Highway 24 (Litchfield) $100,000 Not selected  
37 US12 Reconstruction from Highway 71 to Kandiyohi/Meeker County Line $58,000,000 Not selected  
35 US59 Thin overlay from Nobles/Murray County Line to Highway 62 (Fulda) $300,000 Not selected  
34 US71 Thin overlay from Quality Drive (Redwood Falls) to Highway 71 and additional locations on Highway 71 $1,300,000 Not selected  
34 US12 Thin mill and overlay from 25th St. SE (Willmar) to Highway 71 $300,000 Not selected  
18 US212 Thin overlay eastbound from west of Highway 5 to Highway 5 $100,000 Not selected  
6 Hwy 7 Thin mill and overlay on Highway 7 & Highway 25 Roundabout $100,000 Not selected  
6 US71 Thin overlay on roundabout at Highway 71 & Highway 7 $100,000 Not selected  
5 Hwy 15 Thin overlay on Highway 19 (Winthrop) to north of Highway 19 $100,000 Not selected  
4 Hwy 7 Minor concrete pavement rehab and diamond grinding at the intersection of Highway 23 & Highway 7 (Clara City) - approx 1000 feet on each leg $200,000 Not selected