About this project
Following a transportation study of Hwy 60 through Lake Crystal, a roadway design concept was developed that reflects the current and future transportation needs identified by the city of Lake Crystal, local residents and businesses, and other project stakeholders. A project is planned for 2025 construction that will improve the pavement, safety, traffic flow, accessibility, and bicycle/pedestrian accommodations.
Summary of work
- Reconstruct Hwy 60 from west of the south junction with Blue Earth County Road 20 to east of Lakeview Rd.
- In coordination with the City of Lake Crystal, replace utilities, including storm sewer, and portions of water main and sanitary
- Add a westbound median acceleration lane at Main St.
- Construct a pedestrian trail (with concrete barrier) along the south side of Hwy 60 from Cemetery Rd. to Lakeview Rd.
- Repair bridge over Co. Rd. 6
- Update lighting
- Modify accesses
- Preliminary Layout: February 2024
Traffic impacts
Hwy 60 thru-traffic will be detoured during construction using the follow routes:
Local access to the City of Lake Crystal, businesses, and residents along the project area will be maintained through a variety of routes: