Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2024

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
90 Hwy 13 Medium mill and overlay from I-35W to Yankee Doodle Rd $6,900,000 Not selected RQI does not match on the ground conditions
90 Hwy 95 Resurface road from Hwy 97 to Hwy 36 in Scandia and Stillwater $17,004,000 2030 Projected poor pavement conditions.
90 Hwy 95 Resurface Hwy 95 from the Isanti county line to Hemingway Ave in North Branch $14,185,600 2029 NA
87 Hwy 120 Resurface road on Hwy 120 (Century Ave) from 35 feet north of 4th St to Hwy 36 in Maplewood and bituminous mill and overlay on Hwy 120 (Century Ave) from Hwy 36 to Hwy 244 (County Rd E) in White Bear Lake    $8,770,000   2027   Poor pavement conditions. 
85.5 Hwy 13 Resurface Hwy 13 from Eagle Creek Ave to CSAH 42 in Savage - Future Project $37,229,649 2035 Projected poor pavement conditions.
84 Hwy 5 Repair road on Hwy 5 (W 78th St) from Hwy 41 (Hazeltine Blvd) to Eden Prairie Rd in Chanhassen $21,724,572 2033 Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues.
82 Hwy 97 Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake    $17,700,000   2025   Geometrics. Poor pavement conditions. Ped/bike trail needs. 
82 US Hwy 61 Resurface road, traffic signals, pedestrian improvements, drainage, curb and gutter and replace bridge #96093 on Hwy 61 from 0.2 miles north of Carver Ave to east junction of I-94 in St Paul    $25,259,000   2027, 2028   Poor pavement conditions.
81 Hwy 5 Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave $600,000 Not selected Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down.
81 Hwy 97 Resurface Hwy 97 from US Hwy 61 to Hwy 95 in Scandia $11,716,661 2032 Poor pavement conditions. Project has been deferred several times. 
79 Hwy 96 Resurface road from US Hwy 61 to Hwy 95 $10,280,000 Not selected Projected poor pavement conditions.
78 Hwy 13 Medium mill and overlay from  Scott County Road 42 to Connelly Pkwy $700,000 Not selected RQI does not match on the ground conditions
78 Hwy 3 Medium mill and overlay from Hwy 50 to Dakota County Road 58 $3,300,000 Not selected Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years.
77 Hwy 120 Resurface Hwy 120 from Brookview Dr to 4th St in Maplewood $2,763,119 2032 Projected poor pavement conditions.
77 Hwy 21 Medium mill and overlay from Hwy 19 to Scott County Road 37 $300,000 Not selected Program limited by available funding. Short urban section.
77 Hwy 3 Resurface road on Hwy 3 from Rice County line to Hwy 50 in Hampton $12,933,131 2029 Poor pavement conditions. 
76 Hwy 21 Medium mill and overlay from Sawmill Rd to Mill St $300,000 Not selected RQI does not match on the ground conditions
74 Hwy 13 Medium mill and overlay from Hwy 13 to Dakota Ave $700,000 Not Selected  Program limited by available funding.
74 Hwy 51 Medium mill and overlay from Grey Fox Rd to I694 $300,000 Not selected Recently repaired in 2021
73 952A Resurface road, construct separated bike lanes, signal, ADA and sidewalk work on Hwy 952A/Hwy 47 (University Ave) from Hwy 65 (Central Ave) to I-35W in Mpls $9,500,000 2027 Poor pavement conditions plus ADA and bike needs. 2726-87
73 Hwy 13 Medium mill and overlay legs to and from Scott County Road 21 roundabout $300,000 Not selected Very new pavement either side of new roundabout.
73 Hwy 21 Medium mill and overlay from 7th St to Sawmill Rd $4,300,000 Not selected RQI does not match on the ground conditions
73 Hwy 3 Medium mill and overlay from Bridge 19045 to Mendota Rd $500,000 Not selected RQI does not match on the ground conditions
72 Hwy 121 Resurface pavement, signals, drainage and ADA on Hwy 121 (Lyndale Conn) from WB TH62 loop to W 58th St and CR22 from W 58th St to W 56th St in Mpls and Extend porkchop on Hwy 121 ( Lyndale Conn) at WB intersection with the WB Hwy 62 loop in Mpls and Extend porkchop on Hwy 121 ( Lyndale Conn) at WB intersection with the WB Hwy 62 loop in Mpls    $2,192,000   2025   Poor pavement conditions. 
72 Hwy 13 Medium mill and overlay from Dakota to Washburn ave $1,600,000 Not Selected  Program limited by available funding.
72 Hwy 3 Reconstruct Hwy 3 (Robert St) from Amana Trail to Hwy 62 in Settler's Ridge $13,603,200 2033 RQI does not match on the ground conditions
72 Hwy 95 Medium mill and overlay from Point Rd to I-94 $2,800,000 Not selected RQI does not match on the ground conditions
72 US Hwy 61 Medium mill and overlay from US 10 to 70th St $8,500,000 Not Selected  Program limited by available funding.
72 US Hwy 61 Medium mill and overlay from Hwy 96 to White Bear Lake CL $1,000,000 Not selected RQI does not match on the ground conditions
71 Hwy 13 Medium mill and overlay from Yankee Doodle Rd to I494 $900,000 Not selected RQI does not match on the ground conditions
71 Hwy 3 Medium mill and overlay from Hwy 149 to Bridge 19045 $1,300,000 Not selected Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life.
70 Hwy 13 Repair concrete from I-494 to Hwy 55 in Eagan and Mendota Heights $6,618,480 2029 Poor pavement conditions. 2020 Remaining service life 0 to 5 years. 
70 Hwy 50 Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 (Lillehei Ave) in Douglas Township    $8,000,000   2026   Poor pavement conditions. 
69 Hwy 149 Medium mill and overlay from Hwy 3 to Albano Tr $200,000 Not selected Program limited by available funding.
69 Hwy 3 Resurface Hwy 3 (S Robert Trl) from 145th St to Hwy 149 (Dodd Rd) in Rosemount $6,045,603 2033 NA
69 Hwy 5 Medium mill and overlay from Birch St to Scandia Rd $1,100,000 Not selected Program limited by available funding.
69 US Hwy 61 Medium mill and overlay from Frenchman Rd to Trailer Pk entrance $400,000 Not selected Program limited by available funding.
68 Hwy 101 Medium mill and overlay from NB split with US169 to SB merge with US169  $3,400,000 Not Selected  Program limited by available funding.
68 Hwy 13 Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout $2,000,000 Not selected Program limited by available funding.
68 Hwy 95 Medium mill and overlay from Mulberry to St Saint Croix Trail $500,000 Not selected Program limited by available funding.
68 US Hwy 61 Medium mill and overlay from White Bear Lake Cr to Frenchman Rd $1,800,000 Not selected Program limited by available funding.
68 US Hwy 61 Medium mill and overlay from 250th St to Chisago County Road 31/32 $700,000 Not selected Program limited by available funding.
67 Hwy 5 Resurface road from St. Clair Ave to bridge over I94, resurface Hwy 5 bridge in St. Paul. $19,970,000 2029 Poor pavement conditions. 
67 US Hwy 61 Medium mill and overlay from I-94/Mounds Blvd to Hwy 5/7th St $700,000 Not selected Program limited by available funding.
67 US Hwy 61 Medium mill and overlay from Chisago County Road 31/22 to 267th St  $200,000 Not selected Program limited by available funding.
66 Hwy 13 Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave $700,000 Not Selected  Program limited by available funding.
66 Hwy 95 Medium mill and overlay from St Croix Trail to Point Rd $1,000,000 Not selected Program limited by available funding.
65 Hwy 13 Medium mill and overlay from Dakota County Line to Washburn Ave $700,000 Not Selected  Program limited by available funding.
65 Hwy 5 Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 $200,000 Not selected Program limited by available funding.
64 Hwy 149 Medium mill and overlay from Albano Tr to Hwy 55 $2,600,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Sunrise River to Taylors Falls $6,600,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Bailey Rd to US Hwy 61 $4,100,000 Not selected Program limited by available funding.
64 US Hwy 61 Medium mill and overlay from 170th St to Hwy 97 $1,900,000 Not selected Program limited by available funding.
62 Hwy 243 Medium mill and overlay from Hwy 95 to St Croix River $700,000 Not selected Program limited by available funding.
62 Hwy 95 Medium mill and overlay from I-94 to Valley Creek $700,000 Not selected Program limited by available funding.
61 Hwy 101 Minor concrete pavement repair, from CR 38 to US 10 $3,500,000 Not Selected  Poor pavement conditions. 
61 Hwy 95 Medium mill and overlay from Valley Creek to Bailey Rd $1,200,000 Not selected Program limited by available funding.
59 Hwy 5 Medium mill and overlay from Hwy 25 to Carver  County Road 10 $1,900,000 Not selected Program limited by available funding.
59 Hwy 51 Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over Hwy 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills   $6,477,000   2026   Poor pavement conditions. ADA, bike/ped, and drainage needs. 
58 Hwy 149 Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St $2,500,000 Not selected Program limited by available funding.
57 Hwy 149 Medium mill and overlay from I-494 to Mendota Heights Rd $600,000 Not selected Program limited by available funding.
57 Hwy 50 Medium mill and overlay from Hwy 3 to US52 $4,300,000 Not selected Program limited by available funding.
55 Hwy 121 Medium mill and overlay from I35W to Pedestrian bridge $300,000 Not Selected  Program limited by available funding.
55 Hwy 5 Medium mill and overlay from Carver County Road 10 to Oak Ave $200,000 Not selected Program limited by available funding.
47 Hwy 19 Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project $2,700,000 Not selected NA
47 Hwy 95 Thin mill and overlay from I-94 to Mulberry St $18,000,000 Not selected Projected poor pavement conditions. 2020 RSL is 4 to 6 years.
46 Hwy 101 Repair and resurface road, update guardrail and median barrier, signal replacement, ADA curb ramps, drainage, turn lane extension and pork chop island realignment on Hwy 101 from I-94 in Rogers to CR 38 (70th St NE) in Otsego    $12,674,000   2027   Poor pavement conditions. 
44 Hwy 95 Medium mill and overlay from I-94 to .5 miles S of I-94 $500,000 Not selected Program limited by available funding.
43 Hwy 5 Medium mill and overlay from I-494 to Hennepin/Ramsey County line $3,900,000 Not Selected  Program limited by available funding.
40 Hwy 13 Medium mill and overlay from Washburn Ave to I-35 $1,400,000 Not Selected  Program limited by available funding.
40 Hwy 56 Resurface road on Hwy 56 (Emery Ave) from the Goodhue/Dakota County line to Hwy 52/Hwy 50 (Hampton Ave) in Randolph $9,486,129 2033 Projected poor pavement conditions. 2020 RSL 4 to 11 years. 
39 Hwy 97 Minor rehabilitation within roundabout at US Hwy 61 $100,000 Not selected Newer concrete roundabouts.
27 Hwy 13 Medium mill and overlay from Hwy 13 to Hwy 149 $200,000 Not selected Program limited by available funding.
27 Hwy 13 Medium mill and overlay from Connelly Pkwy to old Hwy 101 $2,000,000 Not selected Program limited by available funding.
25 Hwy 5 Resurface road, improve ADA, lighting, traffic signal replacement, bridge repairs on TH5 from Munster Ave to 0.02 miles east of St Clair Ave in St Paul    $27,117,000   2028   Poor pavement conditions. 
25 Hwy 51 Resurface Hwy 51 (Snelling) from W 7th to Dayton Ave in St. Paul $13,210,469 2030 Poor pavement conditions.
24 Hwy 5 Resurface Hwy 5 from County Rd 11 to Hwy 41 in Chanhassen $6,540,000 2032 Projected poor pavement conditions.
22 Hwy 149 Resurface Hwy 149 (Dodd Rd) from Hwy 55 to bridge over I-494 in Eagan $4,944,240 2033 Preventive maintenance.
21 Hwy 20 Resurface Hwy 20 from Hwy 19 to Hwy 50 in Cannon Falls $6,540,000 2032 Poor pavement conditions. 2020 RSL 2 to 10 years.
21 Hwy 95 Resurface Hwy 95 from Hwy 8 to Hwy 97 in North Branch $19,620,000 2032 NA
19 Hwy 47 Thin mill and overlay from Cree St to Pederson Dr $2,400,000 Not Selected  Safety. Poor pavement conditions.
18 Hwy 95 Resurface Hwy 95 (St Croix Trl) from Hemingway Ave to Manning Bridge over Sunrise River in North Branch $9,168,714 2031 Poor pavement conditions. 2020 RSL 0 to 5 years.
16 Hwy 51 Resurface Hwy 51 from Dayton Ave to Pierce Butler in St. Paul $14,713,584 2034 NA
10 Hwy 244 Resurface Hwy 244 (Dellwood/Mahtomedi Ave) from CR 12 (Stillwater Rd) in Mahtomedi to Hwy 96 (Dellwood Rd) in Dellwood    $6,299,000   2026   Poor pavement conditions. 
0 Hwy 20 Resurface Hwy 20 (Cannon Falls Blvd) from River Road in Cannon Falls to 280th St E at Goodhue and Dakota County line in Cannon Falls Township    $3,420,000   2025   NA

Previous years

View more detailed scores (Excel).

Last updated October 2023

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
13.5 Hwy 284 Resurface Hwy 284 from 122nd Street to Sparrow Road.   $6,862,524   2031 NA
15 Hwy 56 Resurface road from the Goodhue/Dakota County line to Hwy 50/US 52    $7,252,392   2033 Projected poor pavement conditions. 2020 RSL 4 to 11 years. 
18 Hwy 77 Resurface Hwy 77 (Cedar) from 138th St (CR 23) to the Dakota-Hennepin County line in Apple Valley    $45,096,000   2026, 2027   Poor pavement conditions. 
21 Hwy 20 Resurface road from Hwy 19 to Hwy 50    $5,000,000   2032 Poor pavement conditions. 2020 RSL 2 to 10 years.
21 Hwy 95 Resurface Hwy 95 from Jct Hwy 8 to Hwy 97.   $15,000,000   2032 NA
24 Hwy 5 Resurface road from County Rd 11 to Hwy 41   $5,000,000   2032 Projected poor pavement conditions.
25 Hwy 51 Resurface road from W 7th to Dayton Ave    $10,099,747   2030 Poor pavement conditions.
27 Hwy 13 Medium mill and overlay from Connelly Pkwy to old Hwy 101 $2,000,000 Not selected Program limited by available funding.
27 Hwy 13 Medium mill and overlay from Hwy 13 to Hwy 149 $200,000 Not selected Program limited by available funding.
29 US61 Medium mill and overlay from 267th St to I35 $300,000 Not selected Program limited by available funding.
29 Hwy 65 Medium mill and overlay from south of E Moore Lake Dr to Anoka County Road 10 $3,100,000 Not Selected  Program limited by available funding.
31 Hwy 7 Repair road from W end of 494 bridge. to I-494    $500,000   2032 Poor pavement conditions.
32 US61 Medium mill and overlay from RP155 to 170th ST $200,000 Not selected Program limited by available funding.
33 US61 Resurface road from 3rd St. to US 10    $6,250,000   2032 Poor pavement conditions.
34 US61 Resurface road and repair bridge 19075 on Hwy 61 from N Jct Hwy 316 to 4th St in Hastings   $10,867,000   2027   Poor pavement conditions. 
35 Hwy 97 Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake    $15,884,000   2025   Geometrics. Poor pavement conditions. Ped/bike trail needs. 
39 Hwy 97 Minor rehabilitation within roundabout at US61 100000 Not selected Newer concrete roundabouts.
40 Hwy 13 Medium mill and overlay from Washburn Ave to I-35 $1,400,000 Not Selected  Program limited by available funding.
43 Hwy 13 Reconstruct road from Eagle Creek Ave to County Rd 42 $3,500,000 Not selected Projected poor pavement conditions.
43 Hwy 5 Medium mill and overlay from I-494 to Hennepin/Ramsey County line $3,900,000 Not Selected  Program limited by available funding.
43 Hwy 65 Repair road from 217th Ave to Anoka-Isanti County line $18,000,000 Not Selected  Repair early distresses.
44 Hwy 95 Medium mill and overlay from I-94 to .5 miles S of I-94 $500,000 Not selected Program limited by available funding.
46 Hwy 101 Repair and resurface road, update guardrail and median barrier, signal replacement, ADA curb ramps, drainage, turn lane extension and pork chop island realignment on Hwy 101 from I-94 in Rogers to CR 38 (70th St NE) in Otsego    $12,674,000   2027   Poor pavement conditions. 
47 Hwy 19 Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project $2,700,000 Not selected NA
47 Hwy 95 Thin mill and overlay from I-94 to Mulberry St 18000000 Not selected Projected poor pavement conditions. 2020 RSL is 4 to 6 years.
55 Hwy 5 Medium mill and overlay from Carver County Road 10 to Oak Ave $200,000 Not selected Program limited by available funding.
55 Hwy 121 Medium mill and overlay from I35W to Pedestrian bridge $300,000 Not Selected  Program limited by available funding.
57 Hwy 149 Medium mill and overlay from I-494 to Mendota Heights Rd $600,000 Not selected Program limited by available funding.
57 Hwy 50 Medium mill and overlay from Hwy 3 to US52 $4,300,000 Not selected Program limited by available funding.
57 US61 Medium mill and overlay from RP163 to 250TH St $200,000 Not selected Program limited by available funding.
58 Hwy 149 Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St 2500000 Not selected Program limited by available funding.
59 Hwy 5 Medium mill and overlay from Hwy 25 to Carver  County Road 10 $1,900,000 Not selected Program limited by available funding.
60 Hwy 77 Medium mill and overlay from Minnesota River bridge to I-494 $3,100,000 Not Selected  Program limited by available funding.
60 Hwy 5 Repair road from Hwy 41 to Eden Prairie Rd   $16,609,000   2033 Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues.
61 Hwy 95 Medium mill and overlay from Valley Creek to Bailey Rd 1200000 Not selected Program limited by available funding.
61 Hwy 101 Minor concrete pavement repair, from CR 38 to US 10 $3,500,000 Not Selected  Poor pavement conditions. 
62 Hwy 243 Medium mill and overlay from Hwy 95 to St Croix River $700,000 Not selected Program limited by available funding.
62 Hwy 95 Medium mill and overlay from I-94 to Valley Creek 700000 Not selected Program limited by available funding.
63 US61 Medium mill and overlay from 70th St to Carver Ave $4,400,000 Not Selected  Program limited by available funding.
63 US61 Medium mill and overlay from Trailer Pk entrance to 170th St  $1,000,000 Not selected Program limited by available funding.
64 Hwy 149 Medium mill and overlay from Albano Tr to Hwy 55 $2,600,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Bailey Rd to US61 4100000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Sunrise River to Taylors Falls $6,600,000 Not selected Program limited by available funding.
64 US61 Medium mill and overlay from 170th St to Hwy 97 $1,900,000 Not selected Program limited by available funding.
65 Hwy 13 Medium mill and overlay from Dakota County Line to Washburn Ave $700,000 Not Selected  Program limited by available funding.
65 Hwy 5 Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 $200,000 Not selected Program limited by available funding.
66 Hwy 7 Medium mill and overlay from I-494 to Shady Oak Road 1000000 Not Selected  Program limited by available funding.
66 Hwy 95 Medium mill and overlay from St Croix Trail to Point Rd 1000000 Not selected Program limited by available funding.
66 Hwy 13 Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave $700,000 Not Selected  Program limited by available funding.
67 Hwy 7 Medium mill and overlay from Railroad bridge to Hwy 100 $900,000 Not Selected  Program limited by available funding.
67 US61 Medium mill and overlay from Chisago County Road 31/22 to 267th St  $200,000 Not selected Program limited by available funding.
67 US61 Medium mill and overlay from I-94/Mounds Blvd to Hwy 5/7th St $700,000 Not selected Program limited by available funding.
68 Hwy 95 Medium mill and overlay from Mulberry to St Saint Croix Trail $500,000 Not selected Program limited by available funding.
68 US61 Medium mill and overlay from 250th St to Chisago County Road 31/32 $700,000 Not selected Program limited by available funding.
68 US61 Medium mill and overlay from White Bear Lake Cr to Frenchman Rd $1,800,000 Not selected Program limited by available funding.
68 Hwy 13 Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout $2,000,000 Not selected Program limited by available funding.
68 Hwy 65 Medium mill and overlay from 26th St to 10th ST $1,300,000 Not Selected  Program limited by available funding.
68 Hwy 101 Medium mill and overlay from NB split with US169 to SB merge with US169  $3,400,000 Not Selected  Program limited by available funding.
69 Hwy 149 Medium mill and overlay from Hwy 3 to Albano Tr $200,000 Not selected Program limited by available funding.
69 US61 Medium mill and overlay from Frenchman Rd to Trailer Pk entrance $400,000 Not selected Program limited by available funding.
69 Hwy 3 Resurface road from 145th St to Hwy 149   $4,622,021   2033 NA
69 Hwy 5 Medium mill and overlay from Birch St to Scandia Rd $1,100,000 Not selected Program limited by available funding.
70 Hwy 51 Resurface road and ADA improvements on Hwy 51 (Snelling Ave) from Grand Ave to St Clair Ave in St Paul    $2,183,000   2024   Poor pavement conditions. 
70 Hwy 65 Resurface road from NE 37th Ave CL to 53rd Ave NE    $5,270,000   2033 Projected poor pavement conditions.
70 Hwy 101 Resurface road from Hwy 5 (W 78th St) to CSAH 62/Townline Rd, resurface road, drainage repairs and ADA improvements on Hwy 101 (W 192nd Ave) from Hwy 5 to Townline Rd in Chanhassen/Eden Prairie    $1,887,000   2024   Poor pavement conditions. 
71 Hwy 13 Medium mill and overlay from Yankee Doodle Rd to I494 $900,000 Not selected RQI does not match on the ground conditions
71 Hwy 3 Medium mill and overlay from Hwy 149 to Bridge 19045 $1,300,000 Not selected Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life.
72 Hwy 7 Resurface road from TH 25 to Carver County Line    $10,522,000   2033 Projected poor pavement conditions.
72 Hwy 95 Medium mill and overlay from Point Rd to I-94 $2,800,000 Not selected RQI does not match on the ground conditions
72 US61 Medium mill and overlay from US 10 to 70th St $8,500,000 Not Selected  Program limited by available funding.
72 US61 Medium mill and overlay from Hwy 96 to White Bear Lake CL $1,000,000 Not selected RQI does not match on the ground conditions
72 Hwy 13 Medium mill and overlay from Dakota to Washburn ave $1,600,000 Not Selected  Program limited by available funding.
72 Hwy 3 Reconstruct the road from Amana Trail to Hwy 62   $10,400,000   2033 NA
73 Hwy 7 Medium mill and overlay from Texas Ave to Railroad Bridge  700000 Not Selected  RQI does not reflect on the ground conditions
73 Hwy 13 Medium mill and overlay legs to and from Scott County Road 21 roundabout $300,000 Not selected Very new pavement either side of new roundabout.
73 Hwy 21 Medium mill and overlay from 7th St to Sawmill Rd $4,300,000 Not selected RQI does not match on the ground conditions
73 Hwy 3 Medium mill and overlay from Bridge 19045 to Mendota Rd $500,000 Not selected RQI does not match on the ground conditions
74 Hwy 284 Reconstruct road from US 212 to 122nd St   $4,480,000   2031 Many issues with this pavement including geometric and ADA needs. RQI data not reflective of the poor pavement conditions.
74 Hwy 51 Medium mill and overlay from Grey Fox Rd to I694 $300,000 Not selected Recently repaired in 2021
74 Hwy 13 Medium mill and overlay from Hwy 13 to Dakota Ave $700,000 Not Selected  Program limited by available funding.
76 Hwy 50 Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 in Douglas Township   $7,196,000   2026   Poor pavement conditions. 
76 Hwy 21 Medium mill and overlay from Sawmill Rd to Mill St $300,000 Not selected RQI does not match on the ground conditions
77 Hwy 120 Resurface Hwy 120 from BrookView Dr to 4th St.   $2,112,476   2032 Projected poor pavement conditions.
77 Hwy 21 Medium mill and overlay from Hwy 19 to Scott County Road 37 $300,000 Not selected Program limited by available funding. Short urban section.
77 Hwy 3 Resurface road from Rice County line to Hwy 50    $10,207,680   2029 Poor pavement conditions. 
78 Hwy 7 Medium mill and overlay from Shady Oak Rd to Texas Ave $3,000,000 Not Selected  RQI does not reflect on the ground conditions
78 Hwy 13 Medium mill and overlay from  Scott County Road 42 to Connelly Pkwy $700,000 Not selected RQI does not match on the ground conditions
78 Hwy 3 Medium mill and overlay from Hwy 50 to Dakota County Road 58 $3,300,000 Not selected Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years.
78 Hwy 65 Repair pavement and replace bridges 6817 ( new bridge # 02X06) and 9417 (02X07) over Coon Creek, replace box culvert bridge 9465 and ADA, signal replacement on Hwy 65 (Central Ave) from CR 10 (Mounds View Blvd) in Spring Lake Park to 217th Ave in East Bethel, cable median barrier from Bunker Lake Blvd to 237th    $40,546,000   2024   Poor pavement conditions. 
78 Hwy 65 Resurface road form 53rd Ave NE to South Moore Lake Dr $3,000,000 Not Selected  Poor pavement conditions.
79 Hwy 51 Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over Hwy 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills   $6,678,000   2026   Poor pavement conditions. ADA, bike/ped, and drainage needs. 
79 Hwy 96 Resurface road from US 61 to Hwy 95 $10,280,000 Not selected Projected poor pavement conditions.
81 Hwy 7 Resurface road from the Hennepin/Carver County line to Division St and replace bridge over County Road 82.   $31,280,000   2029 Recent resurfacing project. Construction in progress at time of DIV run. Roughness at intersection contribute to poor ride.
81 Hwy 97 Resurface road from US61 to Hwy 95   $8,957,692   2032 Poor pavement conditions. Project has been deferred several times. 
81 US61 Thin mill and overlay from Goodhue/Dakota County Line to Hwy 316 $9,000,000 Not Selected Projected poor pavement conditions.
81 Hwy 5 Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave $600,000 Not selected Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down.
82 US61 Resurface road, traffic signals, pedestrian improvements, drainage, curb and gutter and replace bridge #96093 on Hwy 61 from 0.2 miles north of Carver Ave to east junction of I-94 in St Paul.   $10,000,000   2028 Poor pavement conditions.
87 Hwy 95 Resurface Hwy 95 from Hemingway Ave to Manning Bridge over Sunrise River.   $7,009,720   2031 Poor pavement conditions. 2020 RSL 0 to 5 years.
90 Hwy 95 Resurface Hwy 95 from the Isanti county line to Hemingway Ave    $9,002,400   2028 NA
90 Hwy 95 Resurface road from Hwy 97 to Hwy 36   $13,000,000   2030 Projected poor pavement conditions.
90 Hwy 13 Medium mill and overlay from I-35W to Yankee Doodle Rd $6,900,000 Not selected RQI does not match on the ground conditions
61 Hwy 101 Minor concrete pavement repair, from CR 38 to US 10 $3,500,000 Not Selected  Poor pavement conditions. 

View more detailed scores (Excel).

Last updated October 2022

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
15 Hwy 56 Resurface road from the Goodhue/Dakota County line to Hwy 50/US 52 $5,180,000 2031 Projected poor pavement conditions. 2020 RSL 4 to 11 years. 
18 Hwy 77 Resurface Hwy 77 (Cedar) from 138th St (CR 23) in Bloomington to the Dakota-Hennepin County line in Apple Valley $35,838,000 2026, Future Poor pavement conditions. 
19 Hwy 47 Resurface road and ADA improvements on Hwy 47 (University Ave) from Cree St to Anoka/Isanti County line in St Francis $2,662,000 2025 Safety. Poor pavement conditions. 
20 Hwy 244 Rebuild road from County Rd. 12 to Hwy 96 $4,000,000 2031 NA
21 Hwy 20 Resurface road from Hwy 19 to Hwy 50 $5,000,000 2032 Poor pavement conditions. 2020 RSL 2 to 10 years.
24 Hwy 5 Resurface road from County Rd 11 to Hwy 41 $5,000,000 2032 Projected poor pavement conditions.
25 Hwy 51 Resurface road from W 7th to Dayton Ave $6,100,000 2030 Poor pavement conditions.
27 Hwy 13 Medium mill and overlay from Connelly Pkwy to old Hwy 101 $2,000,000 Not selected Program limited by available funding.
27 Hwy 13 Medium mill and overlay from Hwy 13 to Hwy 149 $200,000 Not selected Program limited by available funding.
29 Hwy 65 Medium mill and overlay from south of E Moore Lake Dr to Anoka County Road 10 $3,100,000 Not Selected  Program limited by available funding.
30 Hwy 47 Medium mill and overlay from US10 to .4 miles NW of US10 $300,000 Not selected Program limited by available funding.
31 Hwy 7 Repair road from W end of 494 bridge. to I-494 $500,000 2030 Poor pavement conditions.
32 Hwy 47 Resurface road from 40th Ave to US 10 $10,500,000 2030 Poor pavement conditions.
33 Hwy 47 Resurface Hwy 47 from 142nd Ave to 153rd Ave (Alpine Dr) $1,600,000 2028 Projected poor pavement conditions. Project has previously been deferred. 2020 RSL 5 years.
33 Hwy 47 Resurface road from 153rd Ave (Alpine Dr) to Cree St NW/St. Francis $15,000,000 2029 Projected poor pavement conditions.
35 Hwy 97 Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake $10,849,000 2025 Geometrics. Poor pavement conditions. Ped/bike trail needs. 
39 Hwy 21 Resurface road from Mill St to US169 $1,500,000 2031 Poor pavement conditions.
39 Hwy 97 Minor rehabilitation within roundabout at US61 $100,000 Not selected Newer concrete roundabouts.
40 Hwy 13 Medium mill and overlay from Washburn Ave to I-35 $1,400,000 Not Selected  Program limited by available funding.
43 Hwy 13 Reconstruct road from Eagle Creek Ave to County Rd 42 $3,500,000 2030 Projected poor pavement conditions.
43 Hwy 5 Medium mill and overlay from I-494 to Hennepin/Ramsey County line $3,900,000 Not Selected  Program limited by available funding.
43 Hwy 65 Repair road from 217th Ave to Anoka-Isanti County line $18,000,000 2029 Repair early distresses.
44 Hwy 95 Medium mill and overlay from I-94 to .5 miles S of I-94 $500,000 Not selected Program limited by available funding.
46 Hwy 101 Repair and resurface road from I-94 to County Rd 38 $8,800,000 2026 Poor pavement conditions. 
47 Hwy 19 Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project $2,700,000 2036 NA
47 Hwy 95 Thin mill and overlay from I-94 to Mulberry St $18,000,000 Not selected Projected poor pavement conditions. 2020 RSL is 4 to 6 years.
55 Hwy 121 Medium mill and overlay from I35W to Pedestrian bridge $300,000 Not Selected  Program limited by available funding.
55 Hwy 5 Medium mill and overlay from Carver County Road 10 to Oak Ave $200,000 Not selected Program limited by available funding.
57 Hwy 149 Medium mill and overlay from I-494 to Mendota Heights Rd $600,000 Not selected Program limited by available funding.
57 Hwy 50 Medium mill and overlay from Hwy 3 to US52 $4,300,000 Not selected Program limited by available funding.
58 Hwy 149 Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St $2,500,000 Not selected Program limited by available funding.
59 Hwy 5 Medium mill and overlay from Hwy 25 to Carver  County Road 10 $1,900,000 Not selected Program limited by available funding.
60 Hwy 5 Repair road from Hwy 41 to Eden Prairie Rd $18,300,000 2032 Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues.
60 Hwy 77 Medium mill and overlay from Minnesota River bridge to I-494 $3,100,000 Not Selected  Program limited by available funding.
61 Hwy 101 Minor concrete pavement repair, from CR 38 to US 10 $3,500,000 2027 Poor pavement conditions. 
61 Hwy 47 Medium mill and overlay from US 10 to Industry Ave  $700,000 Not selected Program limited by available funding.
61 Hwy 95 Medium mill and overlay from Valley Creek to Bailey Rd $1,200,000 Not selected Program limited by available funding.
62 Hwy 243 Medium mill and overlay from Hwy 95 to St Croix River $700,000 Not selected Program limited by available funding.
62 Hwy 95 Medium mill and overlay from I-94 to Valley Creek $700,000 Not selected Program limited by available funding.
64 Hwy 149 Medium mill and overlay from Albano Tr to Hwy 55 $2,600,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Bailey Rd to US61 $4,100,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Sunrise River to Taylors Falls $6,600,000 Not selected Program limited by available funding.
65 Hwy 13 Medium mill and overlay from Dakota County Line to Washburn Ave $700,000 Not Selected  Program limited by available funding.
65 Hwy 5 Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 $200,000 Not selected Program limited by available funding.
66 Hwy 13 Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave $700,000 Not Selected  Program limited by available funding.
66 Hwy 7 Medium mill and overlay from I-494 to Shady Oak Road $1,000,000 Not Selected  Program limited by available funding.
66 Hwy 95 Medium mill and overlay from St Croix Trail to Point Rd $1,000,000 Not selected Program limited by available funding.
67 Hwy 5 Resurface road from St. Clair Ave to bridge over I94 $14,439,000 2028 Poor pavement conditions.
67 Hwy 7 Medium mill and overlay from Railroad bridge to Hwy 100 $900,000 Not Selected  Program limited by available funding.
68 Hwy 101 Medium mill and overlay from NB split with US169 to SB merge with US169  $3,400,000 Not Selected  Program limited by available funding.
68 Hwy 13 Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout $2,000,000 Not selected Program limited by available funding.
68 Hwy 65 Medium mill and overlay from 26th St to 10th ST $1,300,000 Not Selected  Program limited by available funding.
68 Hwy 95 Medium mill and overlay from Mulberry to St Saint Croix Trail $500,000 Not selected Program limited by available funding.
69 Hwy 149 Medium mill and overlay from Hwy 3 to Albano Tr $200,000 Not selected Program limited by available funding.
69 Hwy 3 Resurface road from 145th St to Hwy 149 $4,500,000 2031 NA
69 Hwy 5 Medium mill and overlay from Birch St to Scandia Rd $1,100,000 Not selected Program limited by available funding.
70 Hwy 101 Resurface road from Hwy 5 (W 78th St) to Hwy 10/Townline Rd, resurface road, drainage repairs and ADA improvements on Hwy 101 (W 192nd Ave) from Hwy 5 to Townline Rd in Chanhassen/Eden Prairie $1,799,000 2024 Poor pavement conditions. 
70 Hwy 13 Repair concrete from I-494 to Hwy 55 $5,000,000 2031 NA
70 Hwy 51 Resurface road and ADA improvements on Hwy 51 (Snelling Ave) from Grand Ave to St Clair Ave in St Paul $1,760,000 2024 NA
70 Hwy 65 Resurface road from 37th Ave NE Ave to 53rd NE $5,200,000 2032 Projected poor pavement conditions.
71 Hwy 13 Medium mill and overlay from Yankee Doodle Rd to I494 $900,000 Not selected RQI does not match on the ground conditions
71 Hwy 3 Medium mill and overlay from Hwy 149 to Bridge 19045 $1,300,000 Not selected Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life.
72 Hwy 121 Resurface pavement, signals, drainage and ADA on Hwy 121 (Lyndale Conn) from 0.5 miles west of I-35W pedestrian bridge over Lyndale Ave to W 58th St in Mpls $1,540,000 2025 NA
72 Hwy 13 Medium mill and overlay from Dakota to Washburn ave $1,600,000 Not Selected  Program limited by available funding.
72 Hwy 3 Reconstruct the road from Amana Trail to Hwy 62 $8,800,000 2031 NA
72 Hwy 47 Resurface, drainage, sidewalks and ADA work on Hwy 47 from Hwy 65 to just south of 27th northeast  Ave in Mpls $3,400,000 2027 NA
72 Hwy 7 Resurface road from TH 25 to Carver County Line $6,500,000 2030 Projected poor pavement conditions.
72 Hwy 95 Medium mill and overlay from Point Rd to I-94 $2,800,000 Not selected RQI does not match on the ground conditions
73 Hwy 13 Medium mill and overlay legs to and from Scott County Road 21 roundabout $300,000 Not selected Very new pavement either side of new roundabout.
73 Hwy 21 Medium mill and overlay from 7th St to Sawmill Rd $4,300,000 Not selected RQI does not match on the ground conditions
73 Hwy 3 Medium mill and overlay from Bridge 19045 to Mendota Rd $500,000 Not selected RQI does not match on the ground conditions
73 Hwy 7 Medium mill and overlay from Texas Ave to Railroad Bridge  $700,000 Not Selected  RQI does not reflect on the ground conditions
74 Hwy 13 Medium mill and overlay from Hwy 13 to Dakota Ave $700,000 Not Selected  Program limited by available funding.
74 Hwy 284 Reconstruct road from US 212 to 122nd St $11,000,000 2031 NA
74 Hwy 51 Medium mill and overlay from Grey Fox Rd to I694 $300,000 Not selected Recently repaired in 2021
76 Hwy 21 Medium mill and overlay from Sawmill Rd to Mill St $300,000 Not selected RQI does not match on the ground conditions
76 Hwy 50 Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 in Douglas Township $6,568,000 2026 Poor pavement conditions. 
77 Hwy 120 Resurface road from Ridge Dr to 4th St. $1,200,000 2031 Projected poor pavement conditions.
77 Hwy 21 Medium mill and overlay from Hwy 19 to Scott County Road 37 $300,000 Not selected Program limited by available funding. Short urban section.
77 Hwy 3 Resurface road from Rice County line to Hwy 50 $6,500,000 2028 Poor pavement conditions. 
78 Hwy 13 Medium mill and overlay from  Scott County Road 42 to Connelly Pkwy $700,000 Not selected RQI does not match on the ground conditions
78 Hwy 3 Medium mill and overlay from Hwy 50 to Dakota County Road 58 $3,300,000 Not selected Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years.
78 Hwy 65 Repair pavement and replace bridges 6817 ( new bridge # 02X06) and 9417 (02X07) over Coon Creek and ADA, signal replacement on Hwy 65 (Central Ave) from CR 10 (Mounds View Blvd) in Spring Lake Park to 217th Ave in East Bethel, cable median barrier from Bunker Lake Blvd to 237th $39,898,000 2024 Poor pavement conditions. 
78 Hwy 65 Resurface road form 53rd Ave NE to South Moore Lake Dr $3,000,000 2027 Poor pavement conditions.
78 Hwy 7 Medium mill and overlay from Shady Oak Rd to Texas Ave $3,000,000 Not Selected  RQI does not reflect on the ground conditions
79 Hwy 51 Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over Hwy 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills $6,477,000 2026 Poor pavement conditions. ADA, bike/ped, and drainage needs. 
79 Hwy 96 Resurface road from US 61 to Hwy 95 $10,280,000 2030 Projected poor pavement conditions.
81 Hwy 5 Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave $600,000 Not selected Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down.
81 Hwy 7 Resurface road from the Hennepin/Carver County line to Division St $23,100,000 2031 Recent resurfacing project. Construction in progress at time of DIV run. Roughness at intersection contribute to poor ride.
81 Hwy 97 Resurface road from US61 to Hwy 95 $8,500,000 2028 Poor pavement conditions. Project has been deferred several times. 
87 Hwy 120 Reconstruct road from 4th St in Maplewood to Hwy 244 in White Bear Lake $15,559,000 2027 NA
87 Hwy 95 Resurface Hwy 95 from the Isanti county line to the bridge over Sunrise river $14,800,000 2028 Poor pavement conditions. 2020 RSL 0 to 5 years.
90 Hwy 13 Medium mill and overlay from I-35W to Yankee Doodle Rd $6,900,000 Not selected RQI does not match on the ground conditions
90 Hwy 95 Resurface road from US 8 to Hwy 36 $28,000,000 2029 Projected poor pavement conditions.

View more detailed scores (Excel).

Last updated October 2021

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
90 Hwy 13 Medium mill and overlay from I-35W to Yankee Doodle Rd $6,900,000 Not selected RQI does not match on the ground conditions
87 Hwy 95 Reclaim and overlay from Chisago/Isanti County line to Sunrise River $20,000,000 2028 Poor pavement conditions. 2020 RSL 0 to 5 years.
85 Hwy 5 Medium mill and overlay from Hwy 41 to US212 $6,900,000 Not selected Program limited by available funding. Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues. A minor CPR is planned using PM or BARC funds in 2022 or 2023.
81 Hwy 97 Thin mill and overlay from US61 roundabout to Hwy 95 $11,400,000 2028 Poor pavement conditions. Project has been deferred several times. SP 8212-035.
81 US61 Thin mill and overlay from Goodhue/Dakota County Line to Hwy 316 $9,000,000 2027 Projected poor pavement conditions. SP 1916-028.
81 Hwy 5 Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave $600,000 Not selected Program limited by available funding. Short section of PCC before and after river bridge. Bridge ride is pulling average RQI down.
80 UN52 Medium mill and overlay from Hwy 65 to University Ave $1,600,000 Not selected Program limited by available funding.
79 Hwy 51 Thin mill and overlay from Hwy 36 to Grey Fox Rd $8,200,000 2026 Poor pavement conditions. ADA, bike/ped, and drainage needs. SP 6216-142.
78 Hwy 13 Medium mill and overlay from  Scott County Road 42 to Connelly Pkwy $700,000 Not selected RQI does not match on the ground conditions
78 Hwy 3 Medium mill and overlay from Hwy 50 to Dakota County Road 58 $3,300,000 Not selected Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years.
78 US10 Medium mill and overlay from US61 to .1 miles east of US61 $100,000 Not selected Program limited by available funding. Short piece of 4 lane east of USTH 61. Recently received a UTBWC surface treatment.
77 Hwy 3 Thin mill and overlay from Rice/Dakota County line to Hwy 50 $8,700,000 2028 Poor pavement conditions. SP 1920-047.
77 Hwy 20 Thin mill and overlay from Hwy 19 to Hwy 50 $6,700,000 2028 Poor pavement conditions. 2020 RSL 2 to 10 years.
77 Hwy 21 Medium mill and overlay from Hwy 19 to Scott County Road 37 $300,000 Not selected Program limited by available funding. Short urban section.
76 Hwy 50 Medium mill and overlay from US52 to US61 $5,500,000 2026 Poor pavement conditions. SP 1923-048.
76 Hwy 3 Medium mill and overlay from Amana Trail to Hwy 62/Robert St $13,200,000 2031 NA
76 Hwy 21 Medium mill and overlay from Sawmill Rd to Mill St $300,000 Not selected RQI does not match on the ground conditions
75 Hwy 41 Medium mill and overlay from Hundertmark to Pioneer Trail $300,000 Not selected RQI does not match on the ground conditions
75 Hwy 3 Medium mill and overlay from 145th St to Hwy 149 $6,800,000 2031 NA
74 Hwy 51 Medium mill and overlay from Grey Fox Rd to I694 $300,000 Not selected Recently repaired in 2021.
73 Hwy 13 Medium mill and overlay legs to and from Scott County Road 21 roundabout $300,000 Not selected Very new pavement either side of new roundabout.
73 Hwy 3 Medium mill and overlay from Bridge 19045 to Mendota Rd $500,000 Not selected RQI does not match on the ground conditions
73 Hwy 96 Medium mill and overlay from US61 to Hwy 95 $14,800,000 2030 Projected poor pavement conditions.
73 US10 Medium mill and overlay from I-35W to I694 $3,000,000 Not selected RQI does not match on the ground conditions
73 Hwy 21 Medium mill and overlay from 7th St to Sawmill Rd $4,300,000 Not selected RQI does not match on the ground conditions
72 US61 Medium mill and overlay from Hwy 96 to White Bear Lake CL $1,000,000 Not selected RQI does not match on the ground conditions
72 Hwy 95 Medium mill and overlay from Point Rd to I-94 $2,800,000 Not selected RQI does not match on the ground conditions
71 Hwy 13 Medium mill and overlay from Yankee Doodle Rd to I494 $900,000 Not selected RQI does not match on the ground conditions
71 Hwy 3 Medium mill and overlay from Hwy 149 to Bridge 19045 $1,300,000 Not selected Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life.
71 Hwy 25 Medium mill and overlay from Scott County line to Hwy 5 $7,100,000 Not selected RQI does not match on the ground conditions
70 Hwy 101 Medium mill and overlay from Hwy 5 to Town Line Rd $1,400,000 2024 Poor pavement conditions. SP 2736-046.
69 US61 Medium mill and overlay from Frenchman Rd to Trailer Pk entrance $400,000 Not selected Program limited by available funding.
69 Hwy 5 Medium mill and overlay from Birch St to Scandia Rd $1,100,000 Not selected Program limited by available funding.
69 Hwy 62 Medium mill and overlay from I-35E to US52 $3,500,000 Not selected Program limited by available funding.
69 Hwy 149 Medium mill and overlay from Hwy 3 to Albano Tr $200,000 Not selected Program limited by available funding.
68 Hwy 13 Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout $2,000,000 Not selected Program limited by available funding.
68 Hwy 13 Medium mill and overlay from Hwy 55 to Hwy 13 $2,600,000 Not selected Program limited by available funding.
68 US61 Medium mill and overlay from White Bear Lake Cr to Frenchman Rd $1,800,000 Not selected Program limited by available funding.
68 US61 Medium mill and overlay from 250th St to Chisago County Road 31/32 $700,000 Not selected Program limited by available funding.
68 Hwy 95 Medium mill and overlay from Mulberry to St Saint Croix Trail $500,000 Not selected Program limited by available funding.
67 US61 Medium mill and overlay from I-94/Mounds Blvd to Hwy 5/7th St $700,000 Not selected Program limited by available funding.
67 US61 Medium mill and overlay from Chisago County Road 31/22 to 267th St  $200,000 Not selected Program limited by available funding.
66 Hwy 95 Medium mill and overlay from St Croix Trail to Point Rd $1,000,000 Not selected Program limited by available funding.
65 Hwy 5 Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 $200,000 Not selected Program limited by available funding.
65 US10 Medium mill and overlay from US 61 to St Croix River bridge $3,800,000 2031 Projected poor pavement conditions. 2020 RSL 10 years.
64 Hwy 13 Cold in place recycling and medium overlay from Hwy 19 to Hwy 282 $7,000,000 2022 Poor pavement conditions. SP 7001-123.
64 US61 Medium mill and overlay from 170th St to Hwy 97 $1,900,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Sunrise River to Taylors Falls $6,600,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Bailey Rd to US61 $4,100,000 Not selected Program limited by available funding.
64 Hwy 149 Medium mill and overlay from Albano Tr to Hwy 55 $2,600,000 Not selected Program limited by available funding.
63 US61 Medium mill and overlay from Trailer Pk entrance to 170th St  $1,000,000 Not selected Program limited by available funding.
62 Hwy 41 Medium mill and overlay from Hwy 5 to Hwy 7 $1,100,000 Not selected Program limited by available funding.
62 Hwy 41 Medium mill and overlay from Pioneer Trail to Hwy 5 $1,500,000 2023 Poor pavement conditions. SP 1008-096.
62 Hwy 95 Medium mill and overlay from I-94 to Valley Creek $700,000 Not selected Program limited by available funding.
62 Hwy 243 Medium mill and overlay from Hwy 95 to St Croix River $700,000 Not selected Program limited by available funding.
61 Hwy 47 Medium mill and overlay from US 10 to Industry Ave  $700,000 Not selected Program limited by available funding.
61 Hwy 95 Medium mill and overlay from Valley Creek to Bailey Rd $1,200,000 Not selected Program limited by available funding.
59 Hwy 5 Medium mill and overlay from Hwy 25 to Carver  County Road 10 $1,900,000 Not selected Program limited by available funding.
58 Hwy 149 Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St $2,500,000 Not selected Program limited by available funding.
57 Hwy 50 Medium mill and overlay from Hwy 3 to US52 $4,300,000 Not selected Program limited by available funding.
57 US61 Medium mill and overlay from RP163 to 250TH St $200,000 Not selected Program limited by available funding.
57 Hwy 149 Medium mill and overlay from I-494 to Mendota Heights Rd $600,000 Not selected Program limited by available funding.
55 Hwy 5 Medium mill and overlay from Carver County Road 10 to Oak Ave $200,000 Not selected Program limited by available funding.
50 Hwy 5 Thin mill and overlay from Carver County Road 11 to Hwy 41 $6,900,000 2029 Projected poor pavement conditions.
47 Hwy 95 Thin mill and overlay from I-94 to Mulberry St $18,000,000 2029 Projected poor pavement conditions. 2020 RSL is 4 to 6 years.
44 Hwy 95 Medium mill and overlay from I-94 to .5 miles S of I-94 $500,000 Not selected Program limited by available funding.
40 Hwy 95 Reclaim and overlay from US8 to Hwy 97 $20,700,000 2029 Projected poor pavement conditions.
39 Hwy 97 Minor rehabilitation within roundabout at US61 $100,000 Not selected Newer concrete roundabouts.
39 Hwy 25 Thin mill and overlay from US212 to Hwy 5 $4,100,000 2031 Projected poor pavement conditions. 2020 RSL 11 years.
36 Hwy 13 Reclaim and overlay from Scott County Road 21 Roundabout to Scott County Road 42 $5,200,000 2030 Projected poor pavement conditions.
35 Hwy 97 Reconstruction from I-35W to US61 $9,700,000 2024 Geometrics. Poor pavement conditions. Ped/bike trail needs. SP 8201-021.
33 Hwy 47 Thin mill and overlay from Industry Ave to 153rd Ave $2,100,000 2027 Projected poor pavement conditions. Project has previously been deferred. 2020 RSL 5 years.
33 Hwy 47 Reclaim and overlay from 153Rd ave to Cree St $20,700,000 2029 Projected poor pavement conditions.
32 US61 Medium mill and overlay from RP155 to 170th ST $200,000 Not selected Program limited by available funding.
30 Hwy 47 Medium mill and overlay from US10 to .4 miles NW of US10 $300,000 Not selected Program limited by available funding.
29 US61 Medium mill and overlay from 267th St to I35 $300,000 Not selected Program limited by available funding.
27 Hwy 13 Medium mill and overlay from Hwy 13 to Hwy 149 $200,000 Not selected Program limited by available funding.
27 Hwy 13 Medium mill and overlay from Connelly Pkwy to old Hwy 101 $2,000,000 Not selected Program limited by available funding.
19 Hwy 47 Thin mill and overlay from Cree St to Pederson Dr $2,400,000 2025 Safety. Poor pavement conditions. SP 0206-067.
15 Hwy 56 Thin mill and overlay from Goodhue/Dakota County Line to Hwy 50 $5,000,000 2031 Projected poor pavement conditions. 2020 RSL 4 to 11 years. 1911-026

View more detailed scores (Excel).

Last updated December 2020

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
90 Hwy 13 Medium mill and overlay from I-35W to Yankee Doodle Road $6,370,000 Not Selected Not  district priority. Will continue to monitor pavement performance
83 Hwy 5 Medium mill and overlay from Carver County Road 17 to Hennepin County Road 4 $3,260,000 Not Selected Not  district priority. Will continue to monitor pavement performance
83 Hwy 97 Thin mill and overlay from Roundabout to Hwy 95 $11,450,000 2028  
82 Hwy 19 Medium mill and overlay from Red Wing Ave to LeSueur/Scott County Line $220,000 Not Selected Not  district priority. Will continue to monitor pavement performance
81 Hwy 5 Medium mill and overlay from Fuller Rd to Wooddale Ave $710,000 Not Selected Not  district priority. Will continue to monitor pavement performance
81 Hwy 5 Medium mill and overlay from County Road 4 to Fuller Rd $580,000 Not Selected Not  district priority. Will continue to monitor pavement performance
80 US 10 Medium mill and overlay from .2 miles north of I-694 to I-694 $470,000 Not Selected Not  district priority. Will continue to monitor pavement performance
79 Hwy 62 Medium mill and overlay from I-35E to Hwy 52 $3,420,000 Not Selected Recent rehabilitation completed
79 Hwy 13 Medium mill and overlay from Senneca Rd to Yankee Doodle Rd $620,000 Not Selected Not  district priority. Will continue to monitor pavement performance
78 Hwy 25 Medium mill and overlay from White sty to State St $60,000 Not Selected Not  district priority. Will continue to monitor pavement performance
77 Hwy 13 Medium mill and overlay from County Road 42 to Connelly Pkwy $790,000 Not Selected Not  district priority. Will continue to monitor pavement performance
77 US 61 Medium mill and overlay from Roselawn Ave to Hwy 36 $1,090,000 Not Selected Not  district priority. Will continue to monitor pavement performance
77 US 61 Medium mill and overlay from I-694 to White Bear Ave $2,480,000 Not Selected Not  district priority. Will continue to monitor pavement performance
77 Hwy 19 Thin mill and overlay from LeSueur/Scott County Line to Scott/Rice County Line $3,330,000 2027  
77 Hwy 282 Major rehabilitation from Hwy 21 to Hwy 13 $1,170,000 2021 NA
76 Hwy 5 Major rehabilitation from Sibley/Carver County line to 142nd St $460,000 2021 NA
75 Hwy 47 Medium mill and overlay from 27th Ave to 35th Ave $1,080,000 Not Selected Not  district priority. Will continue to monitor pavement performance
75 Hwy 120 Medium mill and overlay from Ridge Dr to 4th St in Oakdale $1,410,000 2026  
75 US 10 Thin mill and overlay from Hwy 61 to Saint Croix River bridge $460,000 2027 Poor ride quality requires resurfacing.
75 Hwy 149 Major rehabilitation from Hwy 55 to I-494 $320,000 2028 NA
74 Hwy 3 Reconstruction from Amana trail to south of Upper 55th Ave  $6,110,000 2029  
74 Hwy 97 Medium mill and overlay from east of Everton Ave to Hwy 61 Roundabout $30,000 2024 NA
74 Hwy 41 Medium mill and overlay from Engler Rd to Pioneer Tr $520,000 Not Selected Not  district priority. Will continue to monitor pavement performance
73 Hwy 47 Reclaim and overlay from 153rd Ave to Cree St $15,560,000 2027 NA
73 Hwy 95 Reclaim and overlay from Chisago County road 14 to Sunrise river $10,630,000 2028  
73 Hwy 95 Reconstruction from Oakview Ave to Chisago County Rd 14 $6,900,000 2028  
73 Hwy 97 Medium mill and overlay from US61 Roundabout to end of US61 Roundabout $40,000 2024 NA
72 US 61 Medium mill and overlay from Hwy 36 to I-694 $1,690,000 Not Selected Not  district priority. Will continue to monitor pavement performance
72 Hwy 95 Medium mill and overlay from Bailey Rd to 70th St $730,000 Not Selected Recent rehabilitation completed
71 Hwy 3 Medium mill and overlay from 190th to Dakota County Road 58 $610,000 Not Selected Newer roundabout completed 
71 Hwy 13 Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota Ave $600,000 Not Selected Not  district priority. Will continue to monitor pavement performance
71 Hwy 13 Medium mil and overlay from Yankee Doodle Rd to I-494 $380,000 Not Selected Not  district priority. Will continue to monitor pavement performance
71 US 61 Medium mill and overlay from Hwy 96 to .8 miles north $400,000 Not Selected Recent rehabilitation completed
71 Hwy 252 Major rehabilitation from 85th to Hwy 610 $440,000 2025 Corridors of commerce
70 Hwy 101 Medium mill and overlay from Carver County Road 61 to Carver County Road 14 $280,000 Not Selected Not  district priority. Will continue to monitor pavement performance
70 Hwy 3 Medium mill and overlay from Upper 55th St to Robert St $790,000 2029 Selected prior to policy (in 2019-2028 CHIP)
70 Hwy 3 Medium mill and overlay from Railroad crossing to Chesterfield. $260,000 Not Selected Not  district priority. Will continue to monitor pavement performance
70 Hwy 25 Medium mill and overlay from Scott County line to Sibley County Road 14 $500,000 Not Selected Not  district priority. Will continue to monitor pavement performance
70 Hwy 25 Medium mill and overlay from Sibley County Road 14 to Hwy 5 $3,020,000 Not Selected Not  district priority. Will continue to monitor pavement performance
70 Hwy 95 Medium mill and overlay from Hwy 36 to north of 56th St N $940,000 Not Selected Not  district priority. Will continue to monitor pavement performance
69 Hwy 5 Medium mill and overlay from Birch St to Scandia Rd $930,000 Not Selected Not  district priority. Will continue to monitor pavement performance
69 Hwy 47 Major rehabilitation from Central Ave to Broadway St $730,000 2024 NA
69 Hwy 13 Major reconstruction from I-494 to Hwy 55 $5,250,000 2026  
69 Hwy 50 Medium mill and overlay from Hwy 52 to Hwy 60 $5,630,000 2026  
69 US 61 Medium mill and overlay from Hwy 97 to north of Washington County Road 2 $7,600,000 2030 RQI is predicted to fall into the poor category before 2030.
69 US 61 Medium mill and overlay from Frenchman Rd to Trailer Park Entrance $180,000 Not Selected  
69 US 61 Medium mill and overlay from Forest Lake Circle to south of 250th St N $310,000 Not Selected  
69 Hwy 284 Reclaim and overlay from Hwy 212 to Elm Creek Rd $5,760,000 2026 Selected prior to policy (in 2019-2028 CHIP)
69 Hwy 21 Medium mill and overlay from south of Old Hwy 169 to Mill St $120,000 2027  
68 Hwy 21 Medium mill and overlay from 230th St to Meadow Wood Court $570,000 Not Selected  
67 US 61 Medium mill and overlay from 250th St N $330,000 Not Selected  
67 US 61 Medium mill and overlay from Chisago County Road 31/32 to 267th St in Wyoming $70,000 Not Selected  
67 Hwy 19 Medium mill and overlay from Scott County Road 143 to 11th ave SW $90,000 Not Selected  
67 Hwy 95 Medium mill and overlay from north of Commercial Ave to Hwy 36 $440,000 Not Selected  
66 Hwy 97 Medium mill and overlay from I-35W to Hwy 61 $500,000 2024  
65 Hwy 47 Medium mill and overlay from Broadway St to 27th Ave NE $1,270,000 Not Selected  
65 Hwy 3 Medium mill and overlay from 145th St to Hwy 149 $5,760,000 2026 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 13 Medium mill and overlay from I-35E to Hwy 13 $480,000 Not Selected  
65 Hwy 95 Medium mill and overlay from .25 miles South of Valley Creek to .25 miles north of Valley Creek $100,000 Not Selected  
65 Hwy 149 Medium mill and overlay from Hwy 3 to Albano Tr $100,000 Not Selected  
64 Hwy 13 Medium mill and overlay from 2nd St to U-35E $360,000 Not Selected  
63 Hwy 5 Medium mill and overlay from .2 miles east of Carver County Road1 0 to .2 miles west of Carver County Road 10 $90,000 Not Selected  
63 Hwy 121 Medium mill and overlay from Pedestrian Bridge to 58th St $1,230,000 2025 Selected prior to policy (in 2019-2028 CHIP)
63 Hwy 95 Medium mill and overlay from Vista Road to Chisago County Road 16 $180,000 Not Selected  
63 Hwy 96 Medium mill and overlay from Hwy 61 to Hwy 95 $15,350,000 2030 RQI currently in the poor to fair range.
62 Hwy 19 Medium mill and overlay from 11th Ave SW to 5th Ave SW $90,000 Not Selected  
62 Hwy 95 Medium mill and overlay from .7 miles north of I-94 to I-94 $360,000 Not Selected  
62 Hwy 95 Medium mill and overlay from I-94 to Valley Creek $300,000 Not Selected  
62 Hwy 41 Medium mill and overlay from Pioneer Tr to Hwy 5 $440,000 2023 Selected prior to policy (in 2019-2022 STIP)
62 Hwy 41 Medium mill and overlay from Hwy 5 to Hwy 7 $530,000 Not Selected  
61 Hwy 5 Medium mill and overlay from Hwy 25 to .1 miles north $20,000 Not Selected  
61 Hwy 25 Medium mill and overlay from Hwy 5 to Hwy 7 $1,320,000 2021 Selected prior to policy (in 2019-2022 STIP)
60 Hwy 13 Reclaim and overlay form Eagle Creek to Scott  County Road 42 $5,360,000 2030 RQI currently in the poor to fair range.
60 Hwy 95 Reclaim and overlay from Hwy 8 to Hwy 97 $19,580,000 2029 Selected prior to policy (in 2019-2028 CHIP)
59 Hwy 25 Thin mill and overlay from Hwy 212 to Hwy 5 $2,820,000 2026 Selected prior to policy (in 2019-2028 CHIP)
59 US 61 Major rehabilitation from 267th St to I35 $80,000 2021 Selected prior to policy (in 2019-2022 STIP)
58 Hwy 3 Medium mill and overlay from Ann Marie Tr to Amana Tr $50,000 Not Selected  
57 Hwy 25 Medium mill and overlay from .2 miles south of Hwy 7 to Hwy 7 $50,000 Not Selected  
56 Hwy 95 Medium mill and overlay from Chestnut St to north of Commercial Ave $210,000 Not Selected  
55 Hwy 101 Medium mill and overlay from Hwy 5 to Town Line Rd $2,180,000 2026 Selected prior to policy (in 2019-2028 CHIP)
55 Hwy 3 Medium mill and overlay from Ann Marie Trail to Amana Trail $170,000 Not Selected  
54 Hwy 13 Medium mill and overlay from Hwy 55 to 2nd St  $460,000 Not Selected  
50 Hwy 5 Thin mill and overlay from Carver County Road 11 to Hwy 41 $4,900,000 2029 Selected prior to policy (in 2019-2028 CHIP)
48 Hwy 51 Thin mill and overlay from Hwy 36 to Grey Fox Rd $5,760,000 2026 Longitudinal joint distresses need fixing; not necessarily associated with poor ride. Other area needs included.
46 Hwy 20 Thin mill and overlay from Hwy 19 to Hwy 50 $6,620,000 2028 Selected prior to policy (in 2019-2028 CHIP)
44 Hwy 62 Thin mill and overlay from Mendota to I35E $1,250,000 2025 Predicted RQI does not match on the ground conditions. Poor condition requires resurfacing.
43 Hwy 25 Medium mill and overlay from Hwy 7 to White St $1,120,000 Not Selected NA
42 Hwy 3 Thin mill and overlay from Rice/Dakota County line to Hwy 50 $8,740,000 2028 Thin mill and overlay selected for preventive maintenance.
41 US 10 Medium mill and overlay from I35W to north of I494/694 $970,000 Not Selected  
41 Hwy 95 Thin mill and overlay from Isanti trail to west of Falcon Ave $1,520,000 2028 Poor ride requires resurfacing. Coordinating with locals.
40 Hwy 56 Thin mill and overlay from Goodhue/Dakota County line to Hwy 50 $4,390,000 2027 Thin mill and overlay selected for preventive maintenance.
38 Hwy 95 Medium mill and overlay from old County Road 15 to south of Hudson Rd D $440,000 Not Selected  
37 Hwy 95 Medium mill and overlay from .7 miles north of I-94 to I-94 $350,000 Not Selected  
34 Hwy 5 Major rehabilitation from 142nd St to Hwy 212 $140,000 2021 Selected prior to policy (in 2019-2022 STIP)
34 Hwy 47 Thin mill and overlay from 40th Ave to Hwy 10 $15,790,000 2030 RQI predictions do not match conditions on the ground. Requires resurfacing. Other area and local needs included.
34 Hwy 13 Medium mill and overlay from Hwy 19 to 1.5 miles north of Hwy 19 $1,530,000 Not Selected  
32 US 61 Medium mill and overlay from south of 170th st to .1 miles north of 170th $60,000 Not Selected Recent roundabout completed 
30 Hwy 101 Medium mill and overlay from Carver County Road 14 to Kiowa Tr $1,070,000 Not Selected NA
29 Hwy 101 Medium mill and overlay from Kiowa Tr to Lyman Blvd $170,000 Not Selected NA
28 Hwy 95 Reclaim and overlay from Isanti/Chisago County line to north of 392nd st $1,380,000 2028 Poor ride quality requires resurfacing. Coordinating with locals.
26 Hwy 95 Medium mill and overlay from Valley Crk to Jct Bailey $480,000 Not Selected  
26 Hwy 95 Medium mill and overlay from 70th St to Hwy 61 $1,250,000 Not Selected  
19 Hwy 55 Thin mill and overlay from Hwy 100 to Lyndale Ave $2,020,000 Not Selected RQI predictions do not match conditions on the ground. Requires resurfacing. Other functional and local needs included.
19 Hwy 47 Thin mill and overlay from Cree St to Anoka/Isanti County line $3,320,000 2025 Pavement is rough but surface work is secondary. Project driven by safety.
13 Hwy 95 Thin mill and overlay from Hwy 97 to north of Commercial Ave $17,710,000 2029 RQI prediction does not match conditions on the ground. Poor ride requires resurfacing.
9 Hwy 47 Thin mill and overlay from Industry ave to 153rd $2,130,000 2027 Thin mill and overlay selected for preventive maintenance.
4 Hwy 244 Thin mill and overlay from Ash St to Hwy 96 $1,050,000 2025 Notoriously poor riding urban section. Requires resurfacing. Other functional area and local needs included.

View more detailed scores (Excel).

Last updated December 2019

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
95 Hwy 5 Concrete rehabilitation from Highway 41 to Highway 212 $10,600,000 2027  
95 Hwy 13 Medium mill and overlay from I-35W to I-494 $7,100,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
91 Hwy 95 Reclaim and overlay from Isanti/Chisago County Line to Sunrise River $6,600,000 2026  
90 Hwy 95 Reclaim and overlay from Highway 8 to north end of stone wall $19,500,000 2028  
87 Hwy 95 Reclaim and overlay from I-94 to Bailey Rd $2,500,000 2021 NA
86 US61 Medium mill and overlay from Roselawn Ave to White Bear Ave $5,500,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
84 Hwy 47 Reclaim and overlay from Industry Ave NW to Anoka/Isanti County Line $10,200,000 2025  
82 Hwy 97 Reconstruction from Hornsby Ave to roundabout $5,800,000 2024  
81 Hwy 97 Thin mill and overlay from end of roundabout to Highway 95 $3,200,000 2026  
81 US61 Medium mill and overlay from Highway 96 to 170th St $1,300,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
79 Hwy 13 Medium mill and overlay from Scott/Rice County Line to Highway 282  $4,700,000 2022 NA
79 US61 Thin mill and overlay from Highway 316 to Highway 316 in Hastings $3,600,000 2026 NA
79 Hwy 96 Medium mill and overlay from Highway 61 to Highway 95 $5,300,000 2029 NA
77 Hwy 3 Thin mill and overlay from Rice/Dakota County Line to Highway 50 $3,400,000 2026 NA
77 Hwy 120 Medium mill and overlay from Ridge Drive to 4th St $600,000 2026 NA
77 US952A Medium overlay from 2nd Ave N to I-94  $2,900,000 Not Selected Waiting to coordinate with bridge work
76 Hwy 5 Meduim mill and overlay from Sibley Carver County Line to Highway 212 $1,400,000 2021 Selected prior to policy (in 2019-2022 STIP)
76 Hwy 101 Medium mill and overlay from Highway 5 to Town Line Rd $1,700,000 2025 Selected prior to policy (in 2019-2028 CHIP)
76 Hwy 95 Medium mill and overlay from end of stone wall to Point Rd $700,000 Not Selected NA
75 Hwy 41 Thin mill and overlay from Pioneer Trail to Highway 5 $900,000 2023 Selected prior to policy (in 2019-2022 STIP)
74 Hwy 284 Reclaim and overlay from Cologne to Elm Creek Rd $5,700,000 2025 Selected prior to policy (in 2019-2028 CHIP)
74 Hwy 13 Medium mill and overlay from I-35E to Highway 13 $1,000,000 Not Selected NA
73 US61 Medium mill and overlay from Highway 316 to west of Higway 316  $400,000 Not Selected NA
72 Hwy 95 Medium mill and overlay from Point Rd to I-94 $1,800,000 2020 Selected prior to policy (in 2019-2022 STIP)
72 Hwy 47 Medium mill and overlay from Central Ave to 27th Ave $1,300,000 2023 Selected prior to policy (in 2019-2022 STIP)
72 Hwy 121 Medium mill and overlay from pedestrian wall to 58th St $300,000 2024 Selected prior to policy (in 2019-2028 CHIP)
72 Hwy 3 Reconstruction from reference point 143 to Robert St/Old Highway 110 $10,000,000 2029 Selected to in order to start early project development work in a complicated area
72 Hwy 41 Thin mill and overlay from Highway 5 to Highway 7 $1,100,000 Not Selected NA
71 Hwy 95 Reconstruction from Bailey Rd to Highway 61 $6,000,000 Not Selected NA
70 Hwy 50 Medium mill and overlay from Highway 52 to Highway 61 $2,900,000 2023 Selected prior to policy (in 2019-2022 STIP)
70 Hwy 13 Major concrete rehabilitation from I-494 to westbound Highway 55 $2,000,000 2024 Selected prior to policy (in 2019-2028 CHIP)
69 Hwy 3 Medium mill and overlay from 145th St to Highway 149/Dodd Rd $4,700,000 2025 Selected prior to policy (in 2019-2028 CHIP)
69 Hwy 13 Medium mill and overlay from 2nd St to I-35E $800,000 Not Selected NA
65 Hwy 3 Medium mill and overlay from reference point 40 to reference point 143 $500,000 Not Selected NA
64 Hwy 282 Reclaim and overlay from Highway 21 to Highway 13 $3,800,000 2021 Selected prior to policy (in 2019-2022 STIP)
60 Hwy 25 Medium mill and overlay from Highway 5 to roundabout at Highway 7 $2,800,000 2021 Selected prior to policy (in 2019-2022 STIP)
59 Hwy 51 Thin mill and overlay from Highway 36 to Frey Fox Rd $2,000,000 2025 Selected prior to policy (in 2019-2028 CHIP)
59 Hwy 25 Thin mill and overlay from Highway 212 to Highway 5 $900,000 2027 Selected prior to policy (in 2019-2028 CHIP)
58 US61 Medium mill and overlay from Forest Lake city limits to I-35 $1,600,000 2020 Selected prior to policy (in 2019-2022 STIP)
57 Hwy 13 Medium mill and overlay from Highway 55 to 2nd St $1,000,000 Not Selected NA
52 Hwy 62 Thin mill and overlay from I-35E to I-494 $1,300,000 Not Selected NA
51 US10 Thin mill and overlay from I-35W to Highway 10/I-694 $500,000 Not Selected NA
47 Hwy 19 Thin mill and overlay from Le Sueur/Scott County Line to Scott/Rise County Line  $1,300,000 2028 Limited funding for bigger fix, which scores higher
46 US61 Medium mill and overlay from Highway 97 to Forest Lake city limits $1,500,000 2029 Limited funding for bigger fix, which scores higher
43 Hwy 13 Reclaim and overlay from Eagle Creek interchange to Dakota County Road 42 $2,100,000 2028 Selected prior to policy (in 2019-2028 CHIP)
42 US10 Thin mill and overlay from Highway 61 to West end of Saint Croix bridge $1,100,000 Not Selected NA
40 Hwy 56 Thin mill and overlay from Goodhue/Dakota County line to Highway 50 $2,000,000 2027 Limited funding for bigger fix, which scores higher
37 Hwy 25 Medium mill and overlay from Highway 7 roundabout to State St/Highway 25 $2,500,000 Not Selected NA
36 Hwy 5 Thin mill and overlay from Birch St to Scandia Rd $700,000 Not Selected NA
34 Hwy 25 Thin mill and overlay from Scott County Line to Sibley County Road 14 $700,000 Not Selected NA
32 Hwy 47 Thin mill and overlay from 40th Ave to Highway 10 $4,900,000 2029 Score is lower because of urban pavement section included in the project
24 Hwy 5 Thin mill and overlay from Carver County Road 11 to Highway 41 $1,500,000 2028 Score is lower because of urban pavement section included in the project
21 Hwy 20 Thin mill and overlay from Highway 19 to Highway 50/240th St $2,500,000 2028 Limited funding for bigger fix, which scores higher
21 Hwy 3 Thin mill and overlay from Highway 50 to 190th $1,000,000 Not Selected NA
20 Hwy 51 Thin mill and overlay from Grey Fox Rd to I-694  $300,000 Not Selected NA
17 Hwy 97 Roundabout at Highway 61 and Highway 97 $100,000 Not Selected NA
14 US61 Roundabout at Highway 61 and Highway 98 $200,000 Not Selected NA
3 Hwy 5 Thin mill and overlay from Highway 25 to Carver County Road 10  $200,000 Not Selected NA